2.4.2.
Installing the Rails for the Ubox(es)
Note There are two types of rails: one for the Hitachi Advanced server
Procedure
1. Prepare the rails
1. Loosen the screws of each rail.
2. Adjust the length of each rail.
DS7080 assemblies and one for the Ubox(es).
Chapter 2.
Installing the Server in the Rack Cabinet
2-27