Part Names
• Meter
[ X2-M5 ]
1
0.5
0
-1
MULTI GAUGE
-0.5
[ 52X-BW ]
1
BOOST
-1
0
STEPPING
GAUGE
Wiring Method and Installation
BASIC WIRING
Connect to Power
Remove
the key
Installation Example
(In case of MINI R56)
Switch
(Only X2-M5)
Install at desired
place
2
1.5
Mode Lamp
BOOST
x100 kPa
(Only X2-M5)
TEMP
x100 °C
Lamp ON while show-
ing water temperature.
Bezel
Dial
2
Needle
X100kPa
Shows the current
values.
Please carry out wiring with the engine turned OFF and the key removed.
( IGN = 12V with key switch ON)
*Not as normal power source
Fuse
Fuse (3A )
1-pin Connector
Diagnostic
Monitoring
Connector
OBD Connector
*When inserting, make sure that the OBD
connector is placed in the proper direction.
100
120
80
WATER
TEMP
°C
60
20
STEPPING
GAUGE
40
Server
Install to out of
the way places
• Server (Common)
(View from Meter Connection)
1
(View from Car Connection)
4
Switch
(Only X2-M5)
2-pin Connector
Server
Meter
*The X2-M5 can be installed on either the left or right.
*The X2-M5 can be installed on either the left or right.
*The X2-M5 can be installed on either the left or right.
1
0
1
Meter Output Connector
Connect the Meter Cable
2
OBD Connector
Connect to get Communication
Signal
2
3
1-pin Connector
Connect the Fuse Power Cable
4
2-pin Connector
Connect the 2-pin Connector
from the Switch (only X2-M5)
3
Backside
of Meter
5-pin Connectors
3-pin Connectors
The 3-pin connectors can be
connected to any of the three
positions
2
BOOST
X100kPa
-1
STEPPING
GAUGE
OBD Connector
Connect to the Diagnostic
Monitoring Connector
Fuse
Connect to IGN Fuse
(Not as normal power source)
Backside
of Meter
Meter Cable