Advertisement

Quick Links

I. B. 11150-2
RECEIVING
INSTALLATION
MAINTENANCE
INSTRUCTIONS
MODEL P0-6 6- P0-12
THE
ELECTRONIC AIR
CLEANER
,
OIL MIST CONTROL UNIT
PRECIPITRONOil Mist Control Unit is an elec­
tronic air cleaning apparatus used to remove oil
mist from the machine room air. To produce the
desi red results,
must be properly installed and
it
maintained. This Instruction Book gives correct
steps and precautions to be taken. It should be
carefully read before the unit is installed or op­
e rated.
EFFECTIVE MAY, 1957
SUPERSEDES 1. B. 1450·1
EFFECTIVE SEPTEMBER, 1953
WESTINGHOUSE ELECTRIC CORPORATION
HYDE PARK
STURTEVANT DIVISION
BOSTON 36, MASS.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the P0-6 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Westinghouse P0-6

  • Page 1 RECEIVING INSTALLATION MAINTENANCE • • INSTRUCTIONS MODEL P0-6 6- P0-12 ELECTRONIC AIR CLEANER OIL MIST CONTROL UNIT PRECIPITRONOil Mist Control Unit is an elec­ tronic air cleaning apparatus used to remove oil mist from the machine room air. To produce the...
  • Page 2: Typical Installations

    TYPICAL INSTALLAT IONS CHINE MOUNTED CEILING MOUNTED FLOOR MOUNTED...
  • Page 3: Installation

    RECEIVING, UNPACKING AND HANDLING PRECIPITRON Oil Mist Units are shipped com­ pletely assembled and ready to install. Model P0-12 weighs 420 lbs. and the Model P0-6 weighs 320 lbs. Dimensions for each size are shown on Dimension Sheet 1450. shipped from the factory, the power pack and inlet duct flange are on the left-hand side when facing the access door.
  • Page 4 1. B. 1450-2 INSTALLATION PRECIPITRON The efficiency of mist collection decreases rapid­ Connect the 1 ph. supply as Power Pack Wiring. ly as the duct opening or throat the hood is moved shown in Fig. using 7/8" wiring hole in the top of from the source of mist generation.
  • Page 5 See "CAUTION". Ionizer voltage should 12.5 0.5 KV and cell voltage 6 0.5 KV. Us­ :!:" :!:" ually these voltages will low when there is a high voltage short circuit. WESTINGHOUSE ELECTRIC CORPORATION STURTEVANT DIVISION BOSTON 31, MASS. HYDE PARK • •...
  • Page 6: Maintenance

    - Preferably mist with minimum is not effective, a dip tank (at least 24" x 181 x 15' of smoke or carbonized oil. for the P0-12 or 121 x 181 x 1511 for the P0-6) is recommended. Mix a solution one pound of mild Experience has proven that some materials must d e t e r g e n t in each gallon of 130-1500F.
  • Page 7: Operation

    Mter unit and duct system Starting of the Unit. have been properly installed and adjusted, arrange­ ments should be made for the Westinghouse service representative to give the unit a start-up inspection. OPERATION PRECIPITRON operates Principle of Operation.
  • Page 8: Wiring Diagram

    "on" the ammeter should be in the white range to the other side of cabinet. Cover unused wiring (0.4-0.6) for the P0-12 unit and for the P0-6. Recti­ and mounting holes with the plug buttons and dummy fier tubes are visible through the window and should ,...,...