NHR ZigBee S05-ST User Manual

Advertisement

Quick Links

S05-ST User's Manual
S05-ST User's Manual (ZigBee HA Profile)
Ver. 1.01
Copyright 2011-14 Nietzsche Enterprise Co., Ltd. All rights reserved
Nietzsche Enterprise reserves the right to make changes and improvements to its products without notice.
Contact Information: Email: service@nhr.com.tw, Website: www.nhr.com.tw
Content
1) Package Content and S05-ST Views. ............................................................................. 2
2) Installing Mounting for S05-ST ....................................................................................... 3
3) Installing and Replacing Batteries in S05-ST ................................................................ 4
4) Setting Transmission Interval for S05-ST ...................................................................... 5
5) Joining S05-ST to the Network ....................................................................................... 6
6) Removing S05-ST from the Parent's Network ............................................................. 6
7) S05-ST LED Status ............................................................................................................. 7
8) ZigBee Reset ...................................................................................................................... 8
9) Product Specifications .................................................................................................... 8
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ZigBee S05-ST and is the answer not in the manual?

Questions and answers

Summary of Contents for NHR ZigBee S05-ST

  • Page 1: Table Of Contents

    Ver. 1.01 Copyright 2011-14 Nietzsche Enterprise Co., Ltd. All rights reserved Nietzsche Enterprise reserves the right to make changes and improvements to its products without notice. Contact Information: Email: service@nhr.com.tw, Website: www.nhr.com.tw Content 1) Package Content and S05-ST Views. …...…….………...…………………………….……………... 2 2) Installing Mounting for S05-ST .…………………………………………………………………………..
  • Page 2: Package Content And S05-St Views

    S05-ST User’s Manual Congratulations for choosing a world-class digital temperature and humidity sensor using ZigBee wireless transmission technology. This manual is designed to help set up and get the most from the sensor in a few short minutes. Safety notice: Please read and follow the instructions before using this product ...
  • Page 3: Installing Mounting For S05-St

    S05-ST User’s Manual 2 Installing Mounting for S05-ST Requirements:  Mounting fixtures  Drill with 5mm (0.2 inches) drill bit size (if using wall plugs) or 3.5mm (0.14 inches) drill bit size (if not using wall plugs)  Size 1 Phillips screwdriver a) Locate S05-ST with at least 15cm (approx..
  • Page 4: Installing And Replacing Batteries In S05-St

    S05-ST User’s Manual 3 Installing and Replacing Batteries in S05-ST Requirements:  4 x AA batteries a) Twist the base counter-clockwise to gain internal access to the transmitter, then pull the latch towards the hinge to open the battery compartment door: Battery Compartment Link Switch Sensor Cable...
  • Page 5: Setting Transmission Interval For S05-St

    S05-ST User’s Manual 4 Setting Transmission Interval for S05-ST a) If necessary, remove the S05-ST from mounting cradle (see “Installing Mounting for S05-ST” section). b) Twist the base counter clockwise to gain internal access to the transmitter, being careful when separating the base to ensure the sensor cable connector stays connected.
  • Page 6: Joining S05-St To The Network

    S05-ST User’s Manual d) Ensure S05-ST is joined to a parent device (see “Adding S05-ST to the Network” section). e) Use software for reading information from coordinator or gateway device (see relevant device’s manual) to confirm S05-ST transmissions are being received at the correct interval. f) Replace the base by twisting it anti-clockwise until it is firmly secured to the transmitter.
  • Page 7: S05-St Led Status

    S05-ST User’s Manual  Sharp pointed tool a) Ensure parent device (coordinator, gateway, or router) is powered on (see relevant device’s manual). b) Ensure S05-ST is powered on (see “Installing and Replacing Batteries in S05-ST” section) and has already joined the parent’s network (green LED flash once every 60 seconds). c) Twist the base counter clockwise to gain internal access to the transmitter, being careful when separating the base to ensure the sensor cable connector stays connected.
  • Page 8: Zigbee Reset

    S05-ST User’s Manual 8 ZigBee Reset In the case where the parent devices (coordinator, gateway, or router) for S05-ST are no longer available or have been reset, S05-ST will need to be reset by applying a 5-second press to the link switch, the green &...

Table of Contents