Appendix (1) Appendix - Winston PRO 20 EVI Installation And Instruction Manual

High performance inverter heater
Table of Contents

Advertisement

Appendix
Appendix 1 Install sketch map
Remark
1 main unit
2 fan coil
3 rubber flexible connection
4 thermometer
5 manometer
6 Y type valve
8 ball valve
10 bypass valve
Installation request:
1 The factory only offers main unit (1)in the legend, and the other modules
which are indispensable fittings, are provided by users or installation company.
2 The unit which of code contains the letter "B" ,has water pump inside and need
not install water pump outside (16)
3 Automatic ventilation(15)is installed on the top point of the water system。
4 The quantity proportion of two-way valve(13)and three-way valve(14)is
referred to the technical regulation, and there is three-way valve installed on the
farthest place of water system.
5 The ball valve (17) is used when it is swashed, filled water in the water system
and so on.
11 drain filter
12 filter
13 two-way valve
14 three-way valve
15 automatic ventilation
16 water pump
17 ball valve
18 ball valve
19 expandable water tank
20 automatically filled-water
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wi3-20-114-ph-evi-32

Table of Contents