You will need:
Pencil, tape measure, drill, screwdriver, pliers, and appropriate fasteners
1
Locate Installation Screws
2
Bracket Installation
Before installing, review the chart below to confirm the correct number of brackets per blind.
Standard wall mount installation brackets are adjustable and provide ½" to
1½" wall clearance. Determine the height for the top of the bracket
(measured from the floor) by adding ½" to the blind height including the
headrail. When installed, vanes will clear the floor by ½".
3
Headrail Installation
Mount the installation brackets on the headrail, then snap into place
as shown to the right. To remove the headrail, simply push the
release lip up with a screwdriver.
Revision 110420
Made in America
Vertical Blinds
Outside Mount - Installation Guidelines
1 1/2" #8 hex head wood screws (included). Alternative fasteners should be used
for metal, brick, tile, concrete or other material installations (not included in
HOME DECOR hardware package).
Up to 42" 43" - 69" 70" - 94" 95" - 110" 111" - 128" 129" - 148" 149" - 167"
2
3
Place the first bracket directly over the corner of the window
with a maximum of 30" between the remaining brackets.
Adjust the brackets so the vanes clear all obstructions.
Brackets must be installed at the same level.
2612 West Townley Ave, Suite 5, Phoenix, AZ 85021
Phone: 602-995-9659 Fax: 602-995-7157
4
5
6
7
8
Outside Mount
VOM-1