BGH BMPE36CTL Manual page 7

Table of Contents

Advertisement

Glass Wool (Fiberglass) Insulation
Carbon Monoxide (CO).
Formaldehyde
Benzene
More details are available at the websites for OSHA (Occupational Safety and Health
Administration), at www.osha.gov and the State of California's OEHHA (Office of
Environmental Health Hazard Assessment), at www.oehha.org. Consumer education is
important since the chemicals and substances on the list are found in our daily lives.
Most consumers are aware that products present safety and health risks, when improperly
used, handled and maintained.
BLOWER MOTOR SHIPPING BOLT
The first 36 inches of supply air plenum and ductwork must be constructed of sheet metal as
required by NFPA 90B. The supply air plenum or duct must have a solid sheet metal bottom
directly under the unit with no openings, registers or flexible air ducts located in it. If flexible
supply air ducts are used they may be located only in the vertical walls of rectangular plenum,
a minimum of 6 inches from the solid bottom. Metal plenum of duct may be connected to the
combustible floor base, if not, it must be connected to the unit supply duct exposed to the
supply air opening from the downflow unit.
Exposing combustible (non-metal) material to the supply opening of a downflow unit can
cause a fire resulting in property damage, personal injury or death.
Exception warning to downflow:
Installations on concrete floor slab with supply air plenum and ductwork completely encased
must be not less than 2 inches of concrete (See NFPA 90A).
Make sure the blower motor support is tight (3-motor mount
bolts) then check to see if wheel is secured to motor shaft
before operating unit.
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bmpe60ctlBmpe72ctl

Table of Contents