Installation; Introduction; Installation Tailpiece And Intermediate Flange - Ventus BOW PRO B Series Installation Instructions Manual

Thrusters
Hide thumbs Also See for BOW PRO B Series:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 21
4

Installation

4 .1

Introduction

n
ote
The areas in which the electric motor(s)
of the bow thruster(s) and the batter-
ies are positioned must be dry and well
ventilated.
For overall dimensions see drawing, page
141
The bow thruster is supplied in parts as
shown.
4 .2

Installation tailpiece and intermediate flange

• Ensure that the plastic shim plate (1) has been positioned on the
tail piece.
• Place one packing (2) between the tail piece and the tunnel.
• Apply a sealant (e.g. polyurethane*) or silicone) between the tail
piece and packing, and between the packing and the tunnel wall.
• Place the tail piece in the hole in the tunnel.
Any extra packings used should be ones capable of justifying the
tail piece.
*) e.g. Sikaflex®-292.
• Grease the hole of the intermediate flange and position this
flange.
• Grease the threads of the bolts with 'outboard gear grease' *) be-
fore inserting and tightening them.
Check for any leaks immediately the vessel returns to the wa-
ter .
*) A suitable grease is VETUS 'Shipping Grease' , Art. code: VSG.
vetus® Installation instructions BOW PRO Series Thrusters: BOWB065, BOWB076, BOWB090, BOWB110 and BOWB130
ø 185 mm
n
ote
2
1
Outboard Gear
Grease
ENGLISH
M8
6
12 - 15 Nm
(9 - 11 ft.lbf )
25
020808.02

Advertisement

Table of Contents
loading

Table of Contents