BraunAbility Vista 2 Owner's Manual
BraunAbility Vista 2 Owner's Manual

BraunAbility Vista 2 Owner's Manual

Split platform, public use wheelchair lifts
Hide thumbs Also See for Vista 2:

Advertisement

36561 Rev. D
April
2014
Owner Manual
International
Vista 2
Split Platform
Public Use
Wheelchair Lifts
www.braunability.com/international
631 West 11th Street, Winamac, IN 46996, USA
Phone: +1 574 946 6153
Original Instructions
ISO 9001:2008
Fax: +1 574 946 4670

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Vista 2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for BraunAbility Vista 2

  • Page 1 Owner Manual International Vista 2 Split Platform Public Use Wheelchair Lifts www.braunability.com/international ISO 9001:2008 631 West 11th Street, Winamac, IN 46996, USA Phone: +1 574 946 6153 Fax: +1 574 946 4670 36561 Rev. D April 2014 Original Instructions...
  • Page 2 Congratulations The BraunAbility employee family thanks you for purchasing your new wheelchair lift. We design and build each BraunAbility product for reliability, quality and safety. Our founder, Ralph Braun, instilled that ethic from day one and we live by that commitment today.
  • Page 3: Table Of Contents

    Contents Installation and Service Safety Precautions ......... 2 - 3 Lift Operation Safety ..............4 - 6 Specifications ..................7 Lift Terminology ................. 8 Center of Gravity ................9 Lift Installation Position Lift ..............10 - 11 Secure Lift ................12 Attach Power and Ground Cables ........
  • Page 4: Installation And Service Safety Precautions

    W ARNING Never modify (alter) a BraunAbility lift. 36514 W ARNING Replacement parts must be BraunAbility authorized replacements. This symbol indicates the presence of high pressure hydraulic hoses. Use W ARNING Never install screws or fasteners (other than factory equipped).
  • Page 5: Lift Operation Safety

    BraunAbility W ARNING Provide adequate clearance outside the vehicle to accom- result in serious bodily result in minor person- trouble free lift operation.
  • Page 6: Specifications

    The lift has been packaged to prevent damage from the effects of normal humidity, vibration, and shock. W ARNING Never modify (alter) a BraunAbility lift. W ARNING Do not use accessory devices not authorized by BraunAbility W ARNING Do not remove any guards or covers. Maximum...
  • Page 7: Lift Terminology

    Z (cm) Rear Outboard (of vehicle) (passenger's side) VL998IB3448RP-2 63.15 57.83 22.07 BraunAbility wheelchair lifts provide a method The lift must be installed, operated, “Arrows/30°-30°”6-13-90 VL998IB3452RP-2 63.15 59.32 22.07 of boarding and exiting applicable motor and maintained as detailed in this VL998IB3463RP-2 63.15...
  • Page 8: Lift Installation

    Lift Installation Lift Installation Position Lift Position Lift Alignment: Align Align (Parallel) (Parallel) Side-to-Side Alignment: See Figure B on previous page. The lift vertical arms and platform should be perpendicular (90°) to the vehicle floor and parallel (aligned) with the ver- Minimum 12 mm tical sides of door jamb.
  • Page 9: Secure Lift

    Lift Installation Lift Installation Secure lift Attach Power and Ground Cables OEM (+) Cable OEM (-) Cable Lead Cable 36513 Figure G Circuit Protection Device Vehicle Battery 1. Drill two mounting holes 4. Install below floor mounting W ARNING (holes 6 and 7). hardware per instructions supplied in kit.
  • Page 10: Connect Interlock

    CAUTION Lift Installation Lift Installation Attach Power and Ground Cables Connect Interlocks Vehicle and Lift Interlocks POS. CAUTION Battery to Frame NEG. Ground Cable 4 Gauge (21.1mm2) The pump module is equipped with a lift interface Position and secure (not supplied) 9-circuit connector (female socket).
  • Page 11: Platform Angle Adjustment

    Lift Installation Lift Installation Platform Angle Adjustment Turnbuckle Installation and Adjustment Hinged platform halves are secured with and Figure B rotated on turnbuckles. Platform turnbuckles are 36514 fully adjusted during assembly procedures (control Lowering Sequence Requirements platform alignment and leveling). Turnbuckles 36514 are disconnected from the platform brackets for 1.
  • Page 12: Platform Half Stabilizer Roller Installation And Adjustment

    Lift Installation Lift Installation Turnbuckle Installation and Adjustment Platform Half Stabilizer Roller Installation and Adjustment 36514 Turnbuckle Stop Block Vertical Stop block must solidly Hex Nut and Platform contact vertical arm. Lock Washer Bracket Figure A Perform turnbuckle assembly/ Right adjustment procedures, detailed in Figure 2 Turnbuckle...
  • Page 13: Roll Stop Anti-Rattle Installation And Adjustment

    Lift Installation Lift Installation Roll Stop Anti-Rattle Installation and Adjustment Tower Microswitch Adjustment 1. Mount bumper into slot in roll stop using 5/16-18 X 3/4" bolt and 3/8" star washer. Refer to figures B through D. Typical both sides. 36514 Figure D TOWER TOWER...
  • Page 14: Installer Verification

    Lift Installation Installer Verification Tower Microswitch Adjustment Compatibility between the lift and the vehicle The installer shall confirm the compatibility between the lift and the vehicle. Static Test Figure E TOWER TOWER TOWER TOWER Deformation 32942 32943 The unladen platform is positioned mid-way between ground level and vehicle floor level and TOWER TOWER TOWER...
  • Page 15: Lift Operation Safety

    CAUTION Installer Verification Lift Operation Safety CAUTION Dynamic Test Safety Symbols With “A” kg (see table below) applied to the platform, verify that the lift is able to operate throughout its SAFETY FIRST! Know That..full range of normal lifting and lowering. The information contained 1.
  • Page 16 W ARNING Never modify (alter) a BraunAbility lift. required for safe transport of wheelchair passengers. W ARNING Do not use accessory devices not authorized by BraunAbility. W ARNING Load and unload clear of vehicular traffic. W ARNING Do not remove any guards or covers.
  • Page 17: Lift Operating Instructions

    Lift Operating Instructions Lift Operating Instructions Before lift operation, park on transmission in “Park” and en- to the Manual Operating Instruc- a level surface, away from ve- gage the parking brake. Vehicle tions to manually operate lift. hicular traffic. Place the vehicle engine must be running.
  • Page 18 Lift Operating Instructions Manual Operating Instructions Notice: Roll stop must be fully unfolded (ramp position) until the entire wheelchair (or 36514 standee) has crossed the roll stop. See Photos E and F. Release Valve approximate 1.5 mm intervals maximum Valve Tightening 3 Nm Specification: TO LOAD PASSENGER:...
  • Page 19: Manual Operating Instructions

    Manual Operating Instructions Emergency Stop (E-Stop) Operating Instructions E-Stop Button To Activate E-Stop: Push E-Stop button down. To Reset E-Stop: To Unfold Platform (Out): Up (To Raise): 1. Turn lift power OFF. Using hand pump handle (Photo B): Using hand pump handle: 2.
  • Page 20: Maintenance And Lubrication Schedule

    Pin Bearings (4) Roll Stop Foot Bearing (2) Roll Stop Foot Pin Roller Bearings (2) See the Maintenance/Lubrication Schedule for recommended applications per number of cycles. Specified (recommended) Available BraunAbility Lubricant Type Lubricant Amount Part No. Light Penetrating Oil LPS2, General Purpose 16 oz.
  • Page 21 Maintenance and Lubrication Schedule Maintenance and Lubrication Schedule Bridge plate hinge Apply Light Oil - See Lubrication Inner/Outer fold arms (2) Apply grease (synthetic) to contact Diagram areas between upper/lower fold arms. See Lubrication Diagram. Platform hinges (2) Apply Light Oil - See Lubrication Diagram Platform pivot pin bearings (4) Apply Light Oil - See Lubrication...
  • Page 22 750 Cycle lubrication and maintenance procedures at Intervals 750 cycle intervals. Hydraulic Fluid (Pump) - Check level. Use BraunAbility 32840-QT hydraulic Notice: Fluid should be changed if fluid (Exxon Univis HVI 26). Do not ® there is visible contamination. Inspect...
  • Page 23 5. Disassemble lift and recycle components. 631 West 11 Street Winamac, IN 46996 USA Refer to exploded views in appropriate service manual. Authorized Representative: BraunAbility Authorized Representative AUTOADAPT AB Åkerivägen 7 S-443 61 Stenkullen SWEDEN Telephone: +46 (0) 302 254 00 E-mail: contact@autoadapt.se...
  • Page 24: Declaration Of Conformity - Machinery

    Phone: +44 (0) 121 33 35 170 Åkerivägen 7 E-mail: contact@autoadapt.co.uk S-443 61 Stenkullen SWEDEN BraunAbility Wheelchair Lift Systems Sound Pressure Levels per EN ISO 11202 as based on Telephone: +46 (0) 302 254 00 testing on similar models are as follows: E-mail: contact@autoadapt.se Operating...
  • Page 25 Owner Manual International Vista 2 Split Platform Public Use Wheelchair Lifts BraunAbility Limited Warranty ® Consult your local BraunAbility dealer regarding warranty policy. ® www.braunability.com/international Patent #6,464,447 Patent #6,739,824 Patent #5,261,779 Patent #6,065,924 Patent #6,599,079 Patent #7,306,422 Patent #6,238,169 Patent #6,692,217 Patent #7,422,408 www.braunability.com/international...

Table of Contents