Figure 5 Wall Mounting Instructions; Figure 6 Wall Mounting Instructions - Bard 11EER WA W18AB-A User's Application Manual

Table of Contents

Advertisement

See Figures 3A and 3B Mounting Instructions
SUPPLY AIR
OPENING
RETURN AIR
OPENING
CONCRETE BLOCK WALL INSTALLATION
MIS-549 B
Manual 2100-689H
Page
14 of 42
FIGURE 5
Wall Mounting Instructions
WOOD OR STEEL SIDING
WOOD FRAME WALL INSTALLATION
FIGURE 6
Wall Mounting Instructions
INTERIOR FINISHED WALL
OVER FRAME
EXTERIOR FINISH WALL
OVER FRAME
FRAMING MATERIAL
2 x 4'S, 2 x 6'S &/OR
ATTACH TO BOTTOM
STRUCTURAL STEEL
SUPPLY AIR
OPENING
RETURN AIR
OPENING
SEE UNIT DIMENSIONS, FIGURE 2,
FOR ACTUAL DIMENSIONS.
ATTACH TO TOP
PLATE OF WALL
1.000" CLEARANCE
ALL AROUND DUCT
1.000" CLEARANCE
ALL AROUND DUCT
PLATE OF WALL
WALL STRUCTURE
FACTORY SUPPLIED
RAIN FLASHING.
MOUNT ON UNIT
BEFORE INSTALLATION
SUPPLY AIR
DUCT
RETURN AIR
OPENING
BOTTOM MOUNTING
BRACKET. MOUNT ON
WALL BEFORE
INSTALLING UNIT.
SIDE VIEW
MIS-548 A
E + 1.000
B
1.000
SUPPLY DUCT
A
OPENING
I
RETURN DUCT
C
OPENING
K
C
L
2 x 6
THIS STRUCTURAL MEMBER
LOCATED TO MATCH STUD
SPACING FOR REST OF WALL.
A SECOND MEMBER MAY BE
REQUIRED FOR SOME WALLS.

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents