VERDER CARBOLITE GERO HRF 7/324 Installation, Operation And Maintenance Instructions

750c recirculating air furnace

Advertisement

Quick Links

Installation, Operation and Maintenance Instructions
750°C Recirculating Air Furnace - HRF Model: 324 Litres
No Controller
HRF 7/324 + No Controller
MEN-HRF7324-05_NOCTRL
02-08-2019
(
)

Advertisement

Table of Contents
loading

Summary of Contents for VERDER CARBOLITE GERO HRF 7/324

  • Page 1 Installation, Operation and Maintenance Instructions 750°C Recirculating Air Furnace - HRF Model: 324 Litres No Controller HRF 7/324 + No Controller MEN-HRF7324-05_NOCTRL 02-08-2019...
  • Page 2: Table Of Contents

    Contents This manual is for guidance on the use of the Carbolite Gero product specified on the front cover. This manual should be read thoroughly before unpacking and using the furnace or oven. The model details and serial number are shown on the back of this manual.
  • Page 3 Power Adjustment 7.0 Repairs and Replacements Safety Warning - Disconnection from Power Supply Safety Warning - Refractory Fibre Insulation Temperature Controller Replacement Solid-state Relay Replacement Thermocouple Replacement Element Replacement Fuse Replacement 8.0 Fault Analysis Furnace Does Not Heat Up Product Overheats 9.0 Wiring Diagrams 10.0 Fuses and Power Settings 10.1...
  • Page 4: Symbols And Warnings

    1.0   Symbols and Warnings 1.0 Symbols and Warnings Switches and Lights Instrument switch: when the instrument switch is operated the temperature control circuit is energised. Heat light: the adjacent light glows or flashes to indicate that power is being supplied to the elements. General Warnings DANGER –...
  • Page 5: Installation

    2.0   Installation 2.0 Installation Unpacking & Handling When unpacking or moving the product, always lift by its base; do not use the door or any other projecting cover or component to support the equipment when moving it. Use a fork lift or pallet truck to move the product; position the product on a level surface and use an adequate number of personnel to safely move the product into position.
  • Page 6: Electrical Connections

    2.0   Installation Depending on the application of the product, it may be appropriate to position it under an extraction hood. Ensure the extraction hood is switched on during use. Ensure that the product is placed in such a way that it can be quickly switched off or disconnected from the electrical supply.
  • Page 7 2.0   Installation The supply should be fused at the next size equal to, or higher than the current on the label. A table of the most common fuse ratings is also given towards the back of this manual. When the mains cable is factory fitted, internal fuses are also fitted. It is essential that the operator ensures that the product is correctly fused.
  • Page 8: Temperature Controller

    3.0   Temperature Controller 3.0 Temperature Controller If this product is fitted with a temperature controller, instructions are provided separately.
  • Page 9: 2132 Over-Temperature Controller Description (If Fitted)

    4.0   2132 Over-Temperature 4.0 2132 Over-Temperature Controller Description (if fitted) Description Alarm Light Page Scroll D Down Display This over-temperature controller is fitted and supplied ready to use by Carbolite Gero. It is a digital instrument with a latching alarm, requiring no additional panel controls. The controller features easy setting of over-temperature setpoint and reading of current temperature by the over-temperature sensor.
  • Page 10: Operation

    4.0   2132 Over-Temperature 4.2.2 Operation When switched on, the controller lights up, goes through a short test routine and then displays the measured temperature or the over-temperature setpoint. The page key allows access to parameter lists within the controller. A single press of the page key displays the temperature units, normally set to °C;...
  • Page 11: Audible Alarm

    4.0   2132 Over-Temperature Audible Alarm If an audible alarm is supplied for use with the over-temperature controller, it is normally configured to sound on over-temperature condition and to stop sounding when the alarm is acknowledged as given in section 4.2. Note: the alarm may sound during controller start-up.
  • Page 12: Operation

    5.0   Operation 5.0 Operation Operating Cycle This product is fitted with an instrument switch which cuts off power to the control circuit. Connect the product to the electrical supply. Turn on the instrument switch to activate the temperature controllers. The controllers illuminate and go through a short test cycle.
  • Page 13: Atmospheres

    5.0   Operation cause an electrical breakdown of the heating element. If the furnace is used to heat materials that emit smoke or fumes, regularly heat it up to maximum temperature for one hour with the chamber empty to burn away the soot. Atmospheres When an optional gas inlet is fitted, there is a label near the inlet saying "INERT GAS ONLY".
  • Page 14: Maintenance

    6.0   Maintenance 6.0 Maintenance General Maintenance Preventive rather than reactive maintenance is recommended. The type and frequency depends on the product use; the following are recommended. Maintenance Schedule CUSTOMER QUALIFIED PERSONNEL DANGER! ELECTRIC SHOCK. Risk of fatal injury. Only electrically qualified personnel should attempt these maintenance procedures.
  • Page 15 6.0   Maintenance Performance Element Circuit Electrical measurement Measure the current drawn on each phase / cir- Power Consumption cuit Metal Liner Visual check for fit and damage With the furnace at ambient open the door and Circulating Fan make sure the fan is working...
  • Page 16: Cleaning

    6.0   Maintenance 6.2.1 Cleaning Soot deposits may form inside the furnace, depending on the process. At appropriate intervals remove these by heating as indicated in the General Operation Notes. The product's outer surface may be cleaned with a damp cloth. Do not allow water to enter the interior of the case or chamber.
  • Page 17: After-Sales Service

    6.0   Maintenance thermocouple and temperature indicator should be made from time to time to determine whether full calibration is required. Carbolite Gero can supply these items. Depending on the controller fitted, the controller instructions may contain calibration instructions. After-Sales Service Carbolite Gero Service has a team of Service Engineers who can offer repair, calibration and preventive maintenance of furnace and oven products both at the Carbolite Gero factory and at customers’...
  • Page 18: Repairs And Replacements

    7.0   Repairs and Replacements 7.0 Repairs and Replacements Safety Warning - Disconnection from Power Supply Immediately switch the product off in the event of unforeseen circumstances (e.g. large amount of smoke). Allow the product to return to room temperature before inspection. Always ensure that the product is disconnected from the electrical supply before repair work is carried out.
  • Page 19: Solid-State Relay Replacement

    7.0   Repairs and Replacements Solid-state Relay Replacement Disconnect the product from the power supply and remove the appropriate cover as given above. 1. Make a note of the wire connections to the solid state relay, then disconnect them. 2. Remove the solid state relay from the base panel or aluminium plate. 3.
  • Page 20: Fuse Replacement

    7.0   Repairs and Replacements avoid damaging the grooved fibre carriers in which the elements sit; these carriers are fragile. Fuse Replacement Fuses are marked on the wiring diagram with type codes, e.g. F1, F2. For more information on fuses refer to section 10.0. Depending on model and voltage, the different fuse types may or may not be fitted.
  • Page 21: Fault Analysis

    8.0   Fault Analysis 8.0 Fault Analysis Furnace Does Not Heat Up The HEAT The heating element Check also that the SSR is working light is ON has failed correctly The controller shows a The HEAT The thermocouple has broken or has very high temperature light is OFF a wiring fault...
  • Page 22: Product Overheats

    8.0   Fault Analysis Product Overheats Product only heats up The controller when the instrument shows a very high The controller is faulty switch is ON temperature The thermocouple may be The controller faulty or may have been shows a low removed out of the heating temperature chamber...
  • Page 23: Wiring Diagrams

    9.0   Wiring Diagrams 9.0 Wiring Diagrams For wiring diagrams, please contact Carbolite Gero Service. Please quote the serial number and model.
  • Page 24: Fuses And Power Settings

    10.0   Fuses and Power Settings 10.0 Fuses and Power Settings 10.1 Fuses F1 - F2: Refer to the circuit diagrams. GEC Safeclip of the type shown Fitted if supply cable fitted. Internal (glass type F up to 16 A) Supply Fitted on board to some types 38 mm x 10 mm type F fitted on Fuses...
  • Page 25: Specifications

    11.0   Specifications 11.0 Specifications Carbolite Gero reserves the right to change the specification without notice. Chamber Size Max Power Approx (mm) Model Temp Weight Capacity (l) (kW) (°C) (kg) Recirculating Air Furnace heated by mineral insulated elements. HRF 7/324 1000 11.1 Environment The models listed in this manual contains electrical parts and should be stored and used...
  • Page 27 Notes Service Record Engineer Name Date Record of Work...
  • Page 28 The products covered in this manual are only a small part of the wide range of ovens, chamber furnaces and tube furnaces manufactured by Carbolite Gero for laboratory and industrial use. For further details of our standard or custom built products please contact us at the address below, or ask your nearest stockist.

Table of Contents