Product Description - weedingtech FOAMSTREAM L12 User Manual

Hide thumbs Also See for FOAMSTREAM L12:
Table of Contents

Advertisement

L12 – User manual – English (EU/USA) – 15/01/2020 - ISSUE 4
Ensure that the consumable liquid (foam concentrate) is not
subject to temperatures below 5 degrees centigrade at any
time.
Ensure that both the L12 and its water tank are securely
attached to the transport vehicle. It is the responsibility of
the vehicle driver to ensure that any load is secure and that
any payload restrictions are observed. You can refer to
section 14 for more information on transport.
NEVER OPERATE THE L12 WITHOUT FOAMSTREAM®
CONCENTRATE
4

Product description

The L12 weed control unit consists of:
Foamstream® L12
Water tank
Hose reel (20 metres/65.6 ft)
Weeding lance
The L12 houses a diesel-powered boiler, a petrol/gasoline-
powered engine, itself connected via belt drive to a piston
pump and an alternator, a 32 litres/8.45 gal. diesel tank,
and a slot for a Foamstream® concentrate can.
Water is pumped into the boiler, and when it reaches 95
degrees centigrade, the indicator light goes green, indicating
that it is hot enough for weeding. The water flows from the
boiler (12 l/m @ 12 bar – 3.1 gpm @ 174 PSI) and a venturi
mixer opens to allow Foamstream® concentrate to be
injected at a ratio of approximately 99.5 parts water to 0.5
parts
concentrate.
Air
Foamstream® mix as it exits the lance to create the foam.
is
added
to
the
water
The L12 has been designed to require no manual input or
adjustment (See section 0 for operating details).
A safety valve and over-temperature sensor ensure that
internal pressure and temperature will not exceed 120
bar/1740 PSI or 120 degrees centigrade/248 F in the event
of a system fault.
Filters are fitted to the diesel, water and foam systems to
ensure supplies are kept clean and free from debris. These
needs to be checked daily (see section 6). The engine has
an integrated petrol/gasoline filter.
The L12 has an open frame that allows for easy access for
and
maintenance and visual checks. The electrical system is
Figure 1 - L12
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Foamstream l12-019

Table of Contents