CONTENTS General Installation and Operation Instructions .…..……...…….…......... 3 1 Supply of Mounting System ..……..……...……..………..……..……......4 2 Sloping Roof Mount ..........………………………......... 5 2.1 Preparation ..…..........…………….………........6 2.1.1 Installation with roof anchors and auxiliary boards ..........6 2.1.2 Installation with roof anchors and rafters ………………………....... 6 2.1.3 Installation with roof anchors for slate, shingle or metal roofs .......
GENERAL INSTALLATION AND OPERATION INSTRUCTIONS Collector description curing the area against objects falling down from a roof. Only REGULUS fixing elements may be used. Other REGULUS KPS11 Flat Plate Solar Collectors are fixing elements may be used only with a written approval designed for solar domestic hot water heating (DHW), from REGULUS company.
1. DELIVERY OF MOUNTING SYSTEM Mounting kits for fixing and connecting KPS11 solar collectors Code Connection kit for a KPC, KPS, KPG and KPH 7710 (G3/4“ M inlet and outlet, 2 plugs, G3/8“ for air vent valve, sheath for solar temperature sensor)
Rail end plug 4 pcs 4 pcs 4 pcs 4 pcs 11773 Insulation tape 0.8 m 1.5 m 7227 Expansion mount and interconnection kits for 1 KPS11+ANT solar collector Code Expansion mount and interconnection kit for 1 KPS11 solar collector 12188...
90.5 90.5 No. of collectors Total length No. of anchors 251 cm 379 cm 508 cm 109.5 109.5 109.5 109.5 Fig. 2: Layout of roof anchors right overlap (see Fig. 8). 2.1 Prior to installation • Hang the roof anchors onto the auxiliary board re- Prior to installation of solar collectors, select a suitable specting their distribution shown in Fig.
Installation drilled hole. • Remove roofing in places where anchors shall be fixed • Then mount the U-shaped bracket (Fig. 9) on the (Fig. 6). The distance “a” between anchors is defined bolt, between two nuts with a washer. in Fig. 2. •...
Page 8
≈160 a) Stainless steel anchor on rafter, for pantiles, b) Roof anchor of stainless steel incl. screws or zinc-plated steel for pantiles c) Stainless steel roof anchor for metal or slate roofing RIGHT ! d) Hanger bolt for rail fixing Fig.7: Basic overview of fixing elements RIGHT Fig.
2.2 Fixing rails on roof anchors • Have ready two rails in the length required for the number and type of collectors to be installed. • Align the travelling screw head (Fig. 9) with the hori- zontal rail and shift the rail onto it, or shift the bolts M8 bolt with into the rail first and fix to the anchors.
5 – M8 nut for rail 6 – M8x20 allen head bolt 7 – Retaining bracket Fig. 13: Fixing the retaining brackets fittings (Fig. 14, pos. 9) and push the collector to the • Insert nuts into both the rails (Fig. 13). Put the retain- already mounted one until stop.
Rail end plug 4 pcs 4 pcs 4 pcs 4 pcs 11773 Insulation tape 0.8 m 1.5 m 7227 Expansion mount and interconnection kits for 1 KPS11 solar collector Code Expansion mount and interconnection kit for 1 KPS11 solar collector 12188...
4.2 - Flat roof support mounting • Assemble the triangular supports that come partially screwed together (Fig. 16). Fix the loose support ends A flat roof support consist of two base rails, triangular with a bolt (Fig. 16) and tighten all connections. supports and one strut.
Page 13
• Install the strut between the two triangular supports (Fig. 18). Following Fig. 18, insert special M8 nuts into the triangle support rail. Then lay the strut onto the L strut rails and fix it with M8x12 bolts with washers (Fig. 18). •...
Page 14
Secure the support structure either by screwing it into the roof, or applying a burden. In no event the permissible roof load shall be exceeded. Consulting a statics expert in advan- ce is necessary. A damaged roof must be re- insulated by a specialist.
5.2 - Collector interconnecting be installed that will enable connection to the piping. The brass elbow and adapter are involved in Regulus Hydraulic interconnection of collectors shall be done connection kit, code 7710.
In no event plastic tubes can be used for inlet/outlet Number Connecting pipe piping as they do not meet the operation requirements Connection type Max. recomm. for solar systems. collec- flow rate Copper Kombiflex array x collector tors Pipes for collectors can be lead through disused chim- neys, ventilation shafts or grooves in a wall.
Safety valves are always included in pump stations. the respective manual. If no pump station is used in the installation, the solar Regulus pump stations contain the principal components system shall be equipped with a 6 bar safety valve, shown in Fig. 26: resistant to 160 °C.
8. EXPANSION VESSEL SIZING AND WORKING PRESSURE CALCULATION (Tab. 2 is valid for height up to 20 m only, otherwise the size shall be calculated.) 8.1 - Expansion vessel sizing A solar expansion vessel shall be sized for a temper- ature difference between the min.
9. INSTALLATION OF AIR RELEASE VALVES Install the air vent at the highest point of the system. Should there be more places with a risk of air pockets, air vents should be installed also there. It is recommended to amend the air vent with a local pipe widening that calms down the stream and helps in good separating bubbles from the fluid (see pic.
10. SYSTEM FILLING, FLUSHING, LEAK TEST AND AIR BLEEDING The below listed procedures are valid when a Regulus pump station is used. 10.1 Filling • for safety reasons, you should only fill the collectors when there is no direct irradiation from the sun (or cover the collectors) •...
Regulus, spol. s r.o. Regulus offers warranty for this product under the condi- tions specified in the Warranty Certificate. The Warranty Certificate is an integral part of the documents supplied with the product.
14. DATA SHEET FOR KPS11 SOLAR COLLECTOR Dimensions and Weight height × width × thickness 2037 × 1235 × 90 mm construction width 1285 mm total area 2.516 m aperture area 2.295 m absorber area 2.278 m empty weight 45 kg...
Page 23
Diagram of collector power output Momentary collector effi ciency over the aperture area for 1000 W/m insolation. KPS1 Collector power output in zero point for G=1000 W/m is 1802 W. Collector pressure drop...
16. DESCRIPTION OF PROCEDURES FOR ANNUAL PREVENTION CHECKS Warning: Prevention examination and eventual procedure requires a person to get on a roof, a fall arrest is necessary. intervention may be carried out by a qualified person only. Any work on electric wiring may be done by an authorized electrician.
17. SERVICE ACTION FORM This Service Sheet is intended to register service intervention done. Entries may be recorded by an authorized servicing company. This Service Action has been carried out by an authorized servicing company Date of Service Action: ..………………………………………………………………………………. Name of the servicing company: …………………….……………….………………...……….……………….
Need help?
Do you have a question about the KPS11 and is the answer not in the manual?
Questions and answers