CONTENTS General Installation and Operation Instructions ................Collector Technical Data ..………………………………….…………..........… 1 Delivery of Mounting System ..……………………..…………………..………........2 Sloping Roof Mount ...………………………………...………………...……........ 2.1 Overview ...…………………..……………………………………………......... 2.2 Roof anchor installation for sloping roofs ..…………………………........2.2.1 Installation with roof anchors and auxiliary boards ..……………......2.2.2 Installation with roof anchors and rafters ………………………......
GENERAL INSTALLATION AND OPERATION INSTRUCTIONS Collector description REGULUS Flat Plate Solar Collectors are designed for solar domestic hot water heating, backup and pool heating. Solar radiation penetrates the glass and is intercepted by an efficient absorption layer applied on a serpentine-shaped copper absorber. The heat is then transferred into heat carrier fluid. The absorber is sealed in a compact frame with high quality thermal insulation.
Collector Technical Data Model KPC1-BP Dimensions W x L x H [mm] 1000 x 2000 x 96 Collector surface [m Connection dimensions 4 × Ø 22 mm Cu Absorber nickel-plated copper / tube-grid type Absorber surface black chrome Insulation thickness [mm] Max.
Delivery of Mounting System Handle with care, transport damage should be claimed immediately. Mounting kits for fixing and connecting KPC1-BP solar collectors Code Connection kit for a KPC collector array 7710 (3/4“ M inlet and 3/4“ M outlet with a pocket for solar temperature sensor) Roof fixing kit for one KPC 1 collector...
Sloping Roof Mount Overview 3 - B Pic. 1: Collector array and roof anchors Pos. Item Code Flat plate collector 7610 6857 or other, 03-B Roof anchor with M8 bolt/special head for rails depending on roofing type Interconnecting pipes Fixing and interconnecting sets No.
Roof anchor installation for sloping roofs Pay attention to situations when battens are thicker than the auxiliary board (30 mm). Then the auxiliary board shall be mounted on an underlay so that its total thickness equals to that of the battens (see pic.). rafter counter batten battens...
• remove tiles in a line about as long as the auxiliary board. Usually it is sufficient to shift the tiles upwards. room for an auxiliary board roof battens rafter counter batten Pic. 4: Remove roof tiles to fix the board •...
• remove roof tiles where the anchors shall be mounted room for anchor mount roof battens rafter counter batten Pic. 7: Opening the room for anchor installation • cut the counter batten used for fixing the waterproofing membrane and if necessary, use an underlay depending on the desired anchor height •...
2.2.4 Installation with bolts for fixing rails onto a roof This method of installation is preferably used for roofs bitumen corrugated sheets like Gutta or Ondu- line etc., or for corrugated eternit or metal sheets. The bolt shall be screwed into a rafter or another massive wooden roof element using spanner No.
• Align the rails so that they lie in parallel to roof tiles. The diagonal between the rails must be of the same length: D1 = D2 Then tighten the nuts on fixing screws. parallel Pic. 11: Alignment of base rails Collector mounting •...
~100 mm ~800 mm ~100 mm Pic. 13: Distance between the safety retaining brackets • insert nuts into both the rails. Put the retaining side brackets on the rails and fix the collector using M8x18 bolts. 05 – M8 nut for rails 08 –...
Flat roof support mounting A flat roof support consist of two rails, triangular supports and one wind brace. The number of triangular supports depends on the number of collectors. Use one support for each collector. One wind brace is sufficient up to the rail length of 6.15 m.
Page 15
13 mm spanner Pic. 18: Assembly by means of the travelling screws with a special head • fix further triangular supports to the rails in the same manner. Always adjust the distance between them in such a way that the triangular support is positioned approximately under the middle of a collector. If you install also the wind brace between the supports, tighten only one support.
Page 16
• insert M8 nuts (23) into the rail (04). For fixing the wind brace to the rail, use special bolts with a stop. The bolt stop will bore itself into the rail when tightened, thus the precise bolt position is fixed and prevents possible coming loose of the wind brace.
Page 17
• tip over the support structure into its working position (Pic. 22 - the windbrace vertically). Secure the support structure either by screwing it into the roof, or applying a burden. If secured with a burden, for a wind load up to the building height of 8m and snow load up to 0.75 kN/m , the burden must be distributed according to the following table:...
Hydraulic Connection Collector connecting For collector mounting follow the instructions in chapter 2.4. Fasten the first collector and lay the following one next to the first one, maintaining a sufficient gap. Then put on the threaded fittings and push the collector to the already mounted one until stop.
Maximum of 5 collectors may be connected with threaded fittings in a row. The next collector shall be connected via a compensator. Further max. 3 collectors may follow, connected with threaded fittings. It is advisable to keep the connection piping from collectors as short as possible. The recommended pipe diameters and flow rates through collectors in different connection schemes are shown in Tab.
Pump Station The pump station shall be installed in accordance with the respective manual. Regulus pump stations contain these principal components: • circulation pump • thermometer for return line, or also feed line if two-pipe station is used • return line with a ball valve and a check valve •...
Expansion Vessel Sizing and Working Pressure Calculation (valid for height up to 20 m only, otherwise the size shall be calculated) Expansion vessel sizing A solar expansion vessel shall be sized for a temperature difference between the min. winter temperature (as low as -20 °C) and the max.
Installation of Air Release Valves Install the air vent to the highest point of the system. It is recommended to amend the air vent with a local pipe widening that calms down the stream and helps in good separating bubbles from the fluid (see pic. 30). For an efficient removal of bubbles from the system it is advisable to fit the pump station with an air separator (see pic.
System Filling, Flushing, Leak Test and Air Bleeding The below listed procedures are valid when a Regulus pump station is used. 10.1 Filling • in order to fill the system, use a filling device with a reservoir for solar liquid and a filling pump (see pic. 32) •...
10.3 Air bleeding • with the filling pump running, close the bleed valve and increase the pressure up to about 5 bar • close the feed valve and turn off the filling pump, open the regulation screw on the flowmeter (groove horizontally), do not disconnect the filling-pump hoses! •...
Page 26
- natural disaster LEAK TEST DONE AND COMMISSIONED BY: Company: Collector type and model: Installer: Number of pieces: Rubber stamp print, signature: Serial number: Date: 02/200 REGULUS spol. s r.o. Do Koutů 1897/3 http://www.regulus.eu 143 00 Praha 4 E-mail: sales@regulus.cz...