Second Wind 2412-FC Installation Manual

Second Wind 2412-FC Installation Manual

24v coil clean

Advertisement

RARE EARTH MAGNETS F/
FAST INSTALLATION
Rev 7
24V Coil Clean
Installation Manual
EZ-BEND FOR UNDER-COIL
INSTALLATION
Electric Drill
Phillips screwdriver
Tin snips
Eye protection
Tape measure
Aluminum tape & sealant
Multimeter
Hex Driver
Issued: 02/12/2019

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 2412-FC and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Second Wind 2412-FC

  • Page 1 24V Coil Clean Installation Manual RARE EARTH MAGNETS F/ EZ-BEND FOR UNDER-COIL FAST INSTALLATION INSTALLATION   Electric Drill Tape measure   Phillips screwdriver Aluminum tape & sealant   Tin snips Multimeter   Eye protection Hex Driver Rev 7 Issued: 02/12/2019...
  • Page 2 Check damaged parts: Before further use of the unit, any damaged part should be carefully checked to ensure that the unit will operate properly. Any part that is damaged should be properly repaired or replaced. Always service unit with Second Wind replacement parts & recommended accessories (i.e. lamps, ballast). CAUTION: Disconnect power before starting installation or maintenance.
  • Page 3 If the lamp is broken read the ‘Lamp Disposal’ section of this manual. The Second Wind Ultraviolet Germicidal Photo-catalytic 24 Volt Lamp is designed for 9000-11,000 hours of continuous operation. After 9000 hours intensity of the lamp inside the duct diminishes and should be replaced.
  • Page 4 Your new Second Wind Air Purifier must be properly installed, operated and maintained in accordance with the unit installation, operation, and This warranty will be voided if the covered equipment (only Second Wind replacement parts or units are warranted) is removed from the original installation site.

This manual is also suitable for:

2412-03-fc24142414-032414-fc2414-03-fc

Table of Contents