Download Print this page

Replacing The Heating Element - jbc DD-2B Manual

Rm/rework station dd series; jt series

Advertisement

REPLACING THE HEATING ELEMENT

FOLLOW THIS PROCESS INVERTED TO RE-CONNECT THE HEATING ELEMENT
This step has to be performed when the tool is stopped and the heating set is cold.
1. Untighten screw.
2. Separate the heating element from the heating set's handle.
3. Connect the new heating element, pushing it's extreme.
4. Insert screw to avoid air-loss which could reduce the heating element's lifetime.
0009829
Handle
CHANGING THE HEATING SET
1. Ensure that the tool is stopped
2. Use a wrench to unscrew the cover
3. Pull back the seal
4. Pull connector from the socket to disconnect
the heating set from the station
5. Follow steps in reverse
to connect the heating set
0014107 (230V) or
0014105 (100V-120V)
Heating element
JT-T2A (230V) or
JT-T1A (100V-120V)
Heating set
7

Advertisement

loading

This manual is also suitable for:

Dd-1bDd-9bJte-2bJte-1bJte-9bMs-a