Priming Condensate Trap; Alternate Condensate Drain Piping Installation Using Pvc Or Cpvc - Napoleon 9700 B series Installation And Operating Instructions Manual

Two stage high efficiency (condensing) forced air gas furnace
Hide thumbs Also See for 9700 B series:
Table of Contents

Advertisement

34
11.4.2

PRIMING CONDENSATE TRAP

IOM
IOM
IMPORTANT:
THE CONDENSATE DRAIN TRAP ASSEMBLY SHOULD BE FULL OF WATER (PRIMED)
BEFORE STARTING THE FURNACE. TO FILL THE CONDENSATE DRAIN TRAP ASSEMBLY,
TEMPORARILY REMOVE THE VENT DRAIN HOSE FROM THE EXHAUSTER ASSEMBLY
ELBOW/DRAIN FITTING, AND POUR APPROXIMATELY ONE CUP OF WATER DOWN THE
HOSE. WATER WILL BEGIN RUNNING OUT THE CONDENSATE DRAIN TRAP OUTLET
WHEN IT IS FULL. REFASTEN THE VENT DRAIN HOSE TO THE EXHAUSTER ASSEMBLY
ELBOW/DRAIN FITTING.
THE CONDENSATE DRAINAGE CONFIGURATION REQUIRES A VENT. IT TAKES LESS
THAN A ONE INCH RISE ANYWHERE ALONG THE HORIZONTAL ROUTE OF THE DRAIN
TUBE TO CREATE A VAPOR LOCK, WHICH WILL PREVENT CONDENSATE FROM
DRAINING AWAY FREELY, AND RESULT IN ERRATIC FURNACE OPERATION.
11.5 ALTERNATE CONDENSATE DRAIN PIPING INSTALLATION USING PVC OR
CPVC
1. The supplied parts bag includes a length of 1/2" and 5/8" rubber hose and the condensate trap. Install the
condensate trap according to instructions included in this manual.
FIGURE 17
2. If installing with 1/2" PVC, use the 1/2" hose. If installing with 3/4" CPVC, use the 5/8" hose. Slide the
appropriate hose over the condensate trap outlet and cut it fl ush with the end of the outlet. The remaining
rubber should be fl ush with the end of the outlet on the condensate trap. The remaining hose is suffi cient
length to accommodate all furnace orientations.
FIGURE 19
W415-1243 / A / 03.19.15
H16.4.2
FIGURE 18
FIGURE 20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents