Setup And Assembly - Weslo DayBreak510 User Manual

Table of Contents

Advertisement

SETUP AND ASSEMBLY

Before beginning assembly, carefully read the
following information and instructions:
• Place all parts in a cleared area and remove the
packing materials from the spa shell; do not dis-
pose of the packing materials until assembly is
completed and the spa is in operation.
• During assembly, make sure that all parts are ori-
ented as shown in the drawings.
1. Before beginning assembly, be sure that you
have read and understand the information on
the previous two pages.
Remove the four cover screws from the access
cover. Remove the access cover from the spa unit
by sliding the access cover down and pulling the
bottom of the access cover away from the spa unit.
Be careful not to damage the spa shell.
Remove the power cord with the GFCI from inside
the spa unit.
2. Locate the two gate valves. One is shown and the
other is near the Pump Motor (13, see step 3). Fully
open the gate valves.
See the inset drawing. Make sure the locking clips
are snapped securely in place.
3. Close the valve knob on the drain hose. Thread the
cap onto the drain hose. Thread the drain plug into
the Pump Motor (13). Tighten the pump fittings.
All manuals and user guides at all-guides.com
9
• Read each assembly step before you begin.
• Tighten all parts as you assemble them, unless
instructed to do otherwise.
ASSEMBLY REQUIRES THE FOLLOWING
TOOLS (not included):
• One (1) phillips screwdriver
1
Spa
Shell
2
Gate
Valve
3
Pump
Fittings
13
Cap
Drain Plug
Cover
Screws
GFCI
Access
Cover
Cover
Screw
Gate
Locking
Valve
Clip
13
Valve
Drain Hose
Knob

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wlsb40070Wlsg40070Wlsg51020

Table of Contents