Iridium ICHU1000 Installation Manual page 12

Single channel unit
Hide thumbs Also See for ICHU1000:
Table of Contents

Advertisement

Installation
Place the demounted LBT unit near the satellite trans-
ceiver box, without disconnecting it. Rest the bottom of
the satellite transceiver box on a block of soft wood. Use
a hammer and a mandrel to hammer out the brick indi-
cated by a recess in the top of the aluminium case. Be
careful not to pinch, squeeze, or in other ways damage
the ribbon cable. If the hole is not "clean", use a file or
pliers to remove the rest.
ƒ
Turn the LBT unit upside down, and put it into the satellite
transceiver box, pushing the antenna bush up through the
newly made hole. Make sure the ribbon cable is folded
nicely and not pinched under the brackets of the LBT.
Fit the big spring washer and slimline nut on the antenna
bush, and tighten it.
Finally, fasten the LBT unit in the new position using the
four screws and the spring washers.
10
The transceiver box can now be mounted on the wall.
Follow the instructions given above on "How to mount the
satellite transceiver box".
IRIDIUM
0125

Advertisement

Table of Contents
loading

Table of Contents