QV Series Heat Pumps
INSPECTING AND STORING THE
EQUIPMENT

Moving and Storage

If the equipment is not needed for immediate
installation upon its arrival at the job site, it should
be left in its shipping carton and stored in a clean
and dry area. Units must only be stored or moved
in the normal upright position at all times.
NOTICE: Be careful to avoid damage to filter
racks and duct flanges when storing or
handling units.
NOTICE: Never lift or move units by filter
racks, external piping, or attached options/
accessories.
NOTICE: Never stack units when
transporting them.
NOTICE: When storing units:
• Do not stack units larger than 6-tons
capacity!
• Do not stack vertical or counter-flow
units under 6-tons capacity more than
two (2) high.
• Do not stack horizontal units 6-tons
capacity more than three (3) high.

Initial Inspection

Verify that all items have been received and that
there is no visible damage. Note any damage or
shortage on all copies of the freight bill. Concealed
damage not discovered until after removing the
units from packaging must be reported to the
carrier.
QV Series Heat Pumps
Inspection and Unpacking Prior to
Installation
Inspect the product carefully for any defects or
other discrepancies. If any are identified, contact
the Bosch Wholesaler/Distributor from which you
purchased the unit.
The following should be checked:
Compare the electrical data on the unit
nameplate with ordering and shipping
information to verify that the correct unit has
been shipped.
Verify that the unit is the correct model for the
entering water temperature of the job.
Only remove the packaging when the unit is
ready for installation.
Verify that the refrigerant tubing is free of kinks
or dents, and that it does not touch other unit
components.
Inspect all electrical connections. Be sure
connections are clean and tight at the
terminals.
Remove any blower support Styrofoam from
underneath the blower.
Remove any shipping brackets from the unit
attached to the pallet.
Subject to change without prior notice

Inspecting and Storing the Equipment | 7

8733829041 (2021/07)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qv024Qv030Qv036Qv042Qv048Qv060

Table of Contents