Download Print this page

Inspecting And Storing The Equipment; Moving And Storage; Initial Inspection; Standard Package - Bosch Greensource SM024 Installation, Operation And Maintenance Manual

Greensource cdi series sm model water-to-air heat pumps
Hide thumbs

Advertisement

Greensource CDi Series SM Model
INSPECTING AND STORING THE
EQUIPMENT

Moving and Storage

If the equipment is not needed for immediate
installation upon its arrival at the job site, it should
be left in its shipping carton and stored in a clean
and dry area. Units must only be stored or moved
in the normal upright position as indicated by the
"UP" arrows on each carton at all times.
NOTICE: Never lift or move units by filter
racks, external piping, or attached options/
accessories.
WARNING: Follow instructions for stacking
limit for transit as well as storage as per unit
packaging label.

Initial Inspection

Inspect the product carefully for any defects or
discrepancies.
Should you identify any issue, contact the Bosch
Wholesaler/Distributor from which you purchased
the unit.

Standard Package

Fig. 3 SM Series Water-to-Air Heat Pump
Greensource CDi Series SM Model
Fig. 4 Installation and Operation Manual (Note: Actual IOM may differ
from the above photo.)
Fig. 5 Corner Caps Package (HZ units only)
Fig. 6 Hanging Bracket kit (HZ units only)
Fig. 7 Field-Installed Swivel Fittings (VT units only)
Subject to change without prior notice

Inspecting and Storing the Equipment | 7

8733819578 (2019/02)

Hide quick links:

Advertisement

loading