Panasonic CS-E10KD3EA Service Manual page 4

Hide thumbs Also See for CS-E10KD3EA:
Table of Contents

Advertisement

19. During installation, install the refrigerant piping properly before run the compressor. (Operation of compressor without fixing
refrigeration piping and valves at opened condition will cause suck-in of air, abnormal high pressure in refrigeration cycle and result in
explosion, injury etc.).
20. During pump down operation, stop the compressor before remove the refrigeration piping. (Removal of compressor while compressor
is operating and valves are opened will cause suck-in of air, abnormal high pressure in refrigeration cycle and result in explosion,
injury etc.)
21. After completion of the installation servicing, confirm there is no leakage of refrigerant gas. It may generate toxic gas when the
refrigerant contacts with fire.
22. Ventilate if there is refrigerant gas leakage during operation. It may cause toxic gas when the refrigerant contacts with fire.
23. Do not insert your fingers or other objects into the unit, high speed rotating fan may cause injury.
24. Must not use other parts except original parts describe in catalog and manual.
1. Do not install the unit at place where leakage of flammable gas may occur. In case gas leaks and accumulates at surrounding of the
unit, it may cause fire.
2. Carry out drainage piping as mentioned in installation instructions. If drainage is not perfect, water may enter the room and damage
the furniture.
3. Tighten the flare nut with torque wrench according to specified method. If the flare nut is over-tightened, after a long period, the flare
may break and cause refrigerant gas leakage.
4. Do not touch outdoor unit air inlet and aluminium fin. It may cause injury.
5. Select an installation location which is easy for maintenance.
6. Pb free solder has a higher melting point than standard solder; typically the melting point is 50°F - 70°F (30°C - 40°C) higher. Please
use a high temperature solder iron. In case of the soldering iron with temperature control, please set it to 700 ± 20°F (370 ± 10°C).
Pb free solder will tend to splash when heated too high (about 1100°F / 600°C).
7. Power supply connection to the air conditioner.
Use power supply cord 4 × 1.5 mm
Connect the power supply cord of the air conditioner to the mains using one of the following methods.
Power supply point should be in easily accessible place for power disconnection in case of emergency.
In some countries, permanent connection of this air conditioner to the power supply is prohibited.
1. Power supply connection to the receptacle using a power plug.
Use an approved 15/16A power plug with earth pin for the connection to the socket.
2. Power supply connection to a circuit breaker for the permanent connection. Use an approved 16A circuit breaker for the
permanent connection. It must be a double pole switch with a minimum 3.5 mm contact gap.
8. Do not release refrigerant during piping work for installation, servicing, reinstallation and during repairing a refrigeration parts.
Take care of the liquid refrigerant, it may cause frostbite.
9. Installation or servicing work. It may need two people to carry out the installation or servicing work.
10. Do not install this appliance in a laundry room or other location where water may drip from the ceiling, etc.
11. Do not sit or step on the unit, you may fall down accidentally.
12. Do not touch the sharp aluminium fin, sharp parts may cause injury.
2
type designation 245 IEC 57 or heavier cord.
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu-e10hbea

Table of Contents