Overview; Safety - Trane CGWF SE Installation Operation & Maintenance

Indoor water-cooled chillers and water/water heat pumps with scroll compressors and symbio 800 controller
Table of Contents

Advertisement

OVERVIEW

1
1.1
FOREWORD
The instructions are given as a guide to good practice in the installation, start-up, operation, and maintenance by the
contractor or end-user of a CGWF chiller or CXWF heat pump unit. It does not contain full service procedures necessary for the
continued successful operation of this equipment. The services of a qualified technician should be employed through the medium of
a maintenance contract with a reputable service company. Read this manual thoroughly before unit start-up.
1.2
WARRANTY
Warranty is based on the general terms and conditions of the manufacturer. The warranty is void if the equipment is repaired or
modified without the written approval of the manufacturer, if the operating limits are exceeded or if the control system or the
electrical wiring is modified. Damage due to misuse, lack of maintenance or failure to comply with the manufacturer's instructions or
recommendations is not covered by the warranty obligation. If the user does not conform to the rules of this manual, it may entail
cancellation of warranty and liabilities by the manufacturer.
1.3
RECEPTION OF THE UNIT
On arrival, inspect the unit before signing the delivery note. Specify any visible damage on the delivery note, and send a registered
letter of protest to the last carrier of the goods within 7 days of delivery.
Notify the local TRANE Sales office at the same time. The delivery note must be clearly signed and countersigned by the driver.
Any concealed damage shall be notified by a registered letter of protest to the last carrier of the goods within 7 days of delivery.
Notify the local TRANE sales office at the same time.
Important notice: No shipping claims will be accepted by TRANE if the above mentioned procedure is not respected.
For more information, refer to the general sales conditions of your local TRANE sales office.
Note: Unit inspection in France. Delay to send registered letter in case of visible and concealed damage is only 72 hours
1.4
FACTORY INSPECTION
Trane units are inspected in the factory, in appropriate areas, in accordance with internal procedures. Each performance
test carried out on the unit is possible only if the same conditions are reproduced and maintained (charge consistency,
constant temperature and evaporation - condensation and recovery capacity, quality and tolerance of the measuring
instruments etc.) in the test rooms.
The inspection conditions are those indicated by the customer in the ordering phase: if not otherwise specified, reference
should be made to the nominal performance indicated in the technical bulletin in force at the date of the Confirmation of
the Order.
1.5
MAINTENANCE
It is strongly recommended that you sign a maintenance contract with your local Trane Service Agency. This contract
provides regular maintenance of your installation by a specialist in our equipment. Regular maintenance ensures that any
malfunction is detected and corrected in good time and minimizes the possibility that serious damage will occur. Finally,
regular maintenance ensures the maximum operating life of your equipment. We would remind you that failure to respect
these installation and maintenance instructions may result in immediate cancellation of the warranty.
2

SAFETY

All units are designed, built and inspected in compliance with Pressure Equipment Directive (PED97/23/EC or 2014/68/EU and EU
Directive 2006/42/EC.
To avoid death, injury, equipment or property damages the following recommendations should be respected during maintenance
and service visits:
1. The maximum allowable pressures for system leak testing on low and high pressure side are given in the chapter "Installation".
Insure to do not exceed test pressure by using appropriate device
2. Disconnect all power supplies before any servicing on the unit
3. Service work on the refrigeration system and electrical system should be carried out by qualified and experienced personnel
4. To avoid any risk, place the unit in an area or technical room with restricted access
2.1 DEFINITIONS
Owner:
The legal representative of the company, body or natural person who owns the plant in which the Trane unit is installed:
he or she is responsible for the control and respect of all the safety regulations indicated in this manual as well as the
national ones in force.
Installer:

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgwf heCxwf

Table of Contents