Download Print this page

Daikin RKC09NV2S Service Manual Removal Procedure page 19

1.5/2.0/2.5/3.5 kw class 9000/12000 btu/h class

Advertisement

Si001416E
Step
2
Remove the terminal
cover.
3
Remove the protection
bushing.
4
Disconnect the
compressor lead wires.
5
Disconnect the
overload protector.
6
Heat up the brazed part
of the discharge side
pipe and disconnect it.
7
Heat up the brazed part
of the suction side pipe
and disconnect it.
8
Remove the 3 nuts.
9
Lift up the compressor
and remove it.
Removal Procedure
Procedure
U (red)
Protection
bushing
Overload protector
Brazed part of the
discharge side pipe
Compressor
Nut
Electronic Expansion Valve Coil / Compressor
Terminal cover
(R21326)
W (blue)
V (yellow)
(R21327)
Brazed part
of the suction
side pipe
(R21329)
Points
17

Hide quick links:

Advertisement

loading