Master Facp With Slave Fcps-24S Power Supply - Honeywell NOTIFIER FCPS-24S6 Installation Manual

Field charger/power supply
Table of Contents

Advertisement

Master FACP with Slave FCPS-24S Power Supply

5.5 Master FACP with Slave FCPS-24S Power Supply
In this application, an FCPS-24S power supply, configured as a Slave unit, is connected to a master
FACP programmed for synchronized output. The power supply should be set for synchronization
which matches the FACP programming.
Standby Polarity Shown
FACP
See Note 3
-
NAC1
(programmed
for sync)
+
Figure 5.5a: Supervised Master/Slave Connections (Filtered, Synchronized NAC Source)
Standby Polarity Shown
FACP
-
Remote Sync
Output
+
Figure 5.5b: Supervised Master/Slave Connections (Remote Sync Source)
The following notes apply to both illustrations in Figure 5.5 on page 35
1.
Refer to NFPA 72, Chapter 4-4, Visible Characteristics, Public Mode.
2.
Use only devices from the same manufacturer in each system.
3.
If the FACP has a dedicated sync output connector, wire the remote sync output connector to
the FCPS Sync In terminals TB4 terminals 1 & 2. Refer to the Supervised Master/Slave
Connections (Remote Sync Source) in Figure 5.5b.
FCPS-24S Series Instruction Manual — P/N 51977:J2 7/11/2014
Internal Trouble
Contact
FCPS-24S
1 2 3 4 5 6 7 8 9 10
ELR
Internal Trouble
Contact
1 2 3 4 5 6 7 8 9 10
ELR
Figure 5.5 Supervised Master/Slave Connections
SW1 Switch Settings
1 & 2 = sync (any setting
but OFF/OFF)
8
7
3 = ON (slave)
6
5
4 = OFF (no AC Fail
4
3
reporting delay)
2
5 = OFF
1
general alarm
6 = OFF
3
2
7 = OFF (charger enabled)
1
8 = OFF (circuit 4 NAC)
SW1 Switch Settings
1 & 2 = sync (any setting
8
but OFF/OFF)
7
6
3 = ON (slave)
5
4
4 = OFF (no AC Fail
3
reporting delay)
2
1
5 = OFF
3
6 = OFF
2
1
7 = OFF (charger enabled)
8 = OFF (circuit 4 NAC)