Viessmann GENO-Neutra V N-70 Installation And Service Instructions Manual page 4

Neutralising system
Table of Contents

Advertisement

Preparing for installation
Siting
Requirements of the installation room
■ Frost protection
■ Protection against chemicals, dyes,
solvents and dust
■ Protection against high radiation tem-
peratures and direct sunlight
■ Sufficiently large, horizontal, level
and load-bearing installation surface
■ Easy accessibility for maintenance
work
■ Existing bottom drain (sewer connec-
tion min. DN 40) must allow drainage
free of backpressure
4
(cont.)
Note
If the installation room does not have a
bottom drain:
■ Provide an alarm facility to indicate
any fault and, if required, stop the
heat source in order to prevent a sys-
tem overflow and any consequential
damage.
■ The condensate lifting system
V AH-300 (accessories) can be con-
nected downstream.
Choose an installation location that
means the supply and drain hoses are
as short as possible.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Geno-neutra v n-21074418237437829410480410490

Table of Contents