Installing The Turbocharger - ABB TPS 57E01 Operation Manual

Turbocharger
Hide thumbs Also See for TPS 57E01:
Table of Contents

Advertisement

Operation Manual / TPS48-D/E.. - TPS61-D/E..
7 Removal and installation / 7.4 Installing the turbocharger

7.4 Installing the turbocharger

© Copyright 2020 . All rights reserved.
Loosen the fixing screws (D) on the bearing casing.
u
Lift the turbocharger from the engine and put it down.
u
Cover oil connections.
u
Remove covers from oil connections.
u
Visually inspect O-ring gaskets of oil supply and drain pipe (O-ring
u
gaskets for engine are not included in the scope of delivery of ABB).
**) When the turbocharger is mounted on the engine support, the bolt
threads and screw heads must be lightly oiled (assumed friction coeffi-
cient µ = 0.12 for tightening torque)
Product
Through hole in
bearing casing
[mm]
TPS48
17
TPS52
21
TPS57
21
TPS61
25
Attach lifting gear to bearing casing.
u
If a gas outlet manifold is provided, sling lifting gear around it addi-
u
tionally or fasten it to lifting gear using a swivel lifting eye (C) (see
also section Transport / Weights).
Lift turbocharger, place on bracket and align.
u
Tighten fixing screws (D) to the bearing casing in accordance with the
u
table above.
Fasten all gas, water and air lines in accordance with the engineb-
u
uilder's instructions.
HZTL2410_EN
Thread size
Tightening
[mm]
torque
[Nm]
M16
230
M20
455
M20
455
M24
780
Rev.F
Strength class
in acc. with
DIN/ISO 898
10.9/12.9
10.9/12.9
10.9/12.9
10.9/12.9
March 2020

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents