Figure 12 - Form 7 Shipment (K Compressors) - York YK Installation Instructions Manual

Centrifugal liquid chillers with graphic control center for electromechanical starter, solid state starter, and variable speed drive. field reassembly for form 3, 7, 9, and form 10 shipment
Hide thumbs Also See for YK:
Table of Contents

Advertisement

FORM 160.75-N3
SECTION 1 - SHIPPING AND REASSEMBLY
ISSUE DATE: 04/15/2019
K COMPRESSORS (CONT'D)
DISCHARGE
SPOOL
SUCTION
LINE
ISOLATION
VALVE
(IF FURNISHED)
OIL
LINE
RING GASKETS
(See NOTE*)
HOT GAS
(IF FURNISHED)
LIQUID
LINE
NOTE:
* Ring Gaskets NOT used for elastomer-lined flange faces at the Isolation Valve.
LD13173

FIGURE 12 - FORM 7 SHIPMENT (K COMPRESSORS)

20
JOHNSON CONTROLS

Advertisement

Table of Contents
loading

This manual is also suitable for:

R-134aR-513a

Table of Contents