FORM 160.75-N3
ISSUE DATE: 04/15/2019
5. Reconnect motor power leads in the Variable
Speed Drive to T1, T2, and T3 terminals and
torque to 18-20 Ft-lbs. per the labels in the VSD.
6. Reconnect motor winding thermistor shielded ca-
ble conductors in the Variable Speed Drive at TB4
(refer to Wiring Diagrams - Field Connections -
Remote Mounted MV SSS (Form 160.75-PW2).
7. Reconnect all unit wiring and harnesses (refer to
Wiring Diagrams - Field Connections - Remote
Mounted MV SSS (Form 160.75-PW2).
8. Pressure test the unit.
Relief valves must be plugged or capped
(refer to Unit Operations and Mainte-
nance, Form 160.75-O1).
9. FORM 9 - Remove nitrogen and charge unit with
refrigerant (refer to Unit Operations and Mainte-
nance (Form 160.75-O1).
JOHNSON CONTROLS
SECTION 1 - SHIPPING AND REASSEMBLY
10. All Units – Complete installation and finally level
the unit (refer to Installation - Unit (Form 160.75-
N1).
65°
Min.
Lifting
Holes
Lifting
Holes

FIGURE 5 - VARIABLE SPEED DRIVE RIGGING

65°
Min.
LD16730