Ac Power Cord; Power Failure; Installing Power Cord Retainer - D-Link DGS-1210-10/FL Quick Installation Manual

8 10/100/1000base-t + 2 1000base-x sfp ports l2 management switch
Table of Contents

Advertisement

Available languages

Available languages

1. Verify if the system power is off.
2. Place the terminal lug ring of the grounding
cable on top of the ground-screw opening,
insert the grounding screw into it and
tighten the screw with a screwdriver.
3. Attach the terminal lug ring at the other
end of the grounding cable to an
appropriate grounding stud or bolt on rack
where the switch is installed.
4. Verify if the connections at the ground
connector on the switch and the rack are
securely attached.
Step 3 – Plugging in the

AC Power Cord

You can now connect the AC power cord into the rear of
the switch and to an electrical outlet (preferably one that
is grounded and surge protected).

Power Failure

As a precaution, the switch should be unplugged in
case of power failure. When power is resumed, plug the
switch back in.

Installing Power Cord Retainer

To prevent accidental removal of the AC power cord, it is
recommended to install the power cord retainer together
with the power cord.
1. With the rough side facing down, insert the Tie Wrap
into the hole below the power socket.
2. Plug the AC power cord into the power socket of the
Switch.
3. Slide the Retainer through the Tie Wrap until the end of
the cord.
4. Circle the tie of the Retainer around the power cord
and put it into the locker of the Retainer.
3

Advertisement

Table of Contents
loading

Table of Contents