WEG VBWC Series Installation,Operation And Maintenance Instruction page 11

Vacuum circuit breaker
Table of Contents

Advertisement

Available languages

Available languages

www.weg.net
Figure 5.1: Installation
1. Vertical Insulation Barrier
2. Horizontal Insulation Barrier
3. Vaccum Interrupters slots
Installation
1. The insulation Barrier (1) is iserted between the Vacuum Interrupters, as per the details figures.
2. Assembly the Vertical Barrier firstly and then the horizontal barrier in the connection part as per detail figure.
3. Assembly the Circuit Breaker in the Switchgear, align the fixing holes with the fixing base of Switchgear. Use
M12 bols, nuts and washers to fix the Circuit Breaker.
4. The earthing cable must be fixed in the hole with Earth Symbol.
Vacuum Circuit Breaker | 11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vbwc-17p25a06m4c4t4sa2u0a0

Table of Contents