Partial flow commercial room ventilator 24 volt on/off with spring return and exhaust. for use with bard single stage wall mount air conditioner and heat pump models: w42ac, w48ac, w60ac, w72ac, w42hc, w48hc, w60hc (17 pages)
COMMERCIAL ROOM VENTILATOR WITH SPRING RETURN AND EXHAUST Models: WCRVPS2P WCRVPS3P WCRVPS5P WCRVPS6P For Use with Bard Single Stage Wall Mount Air Conditioner and Heat Pump Models: WCRVPS2P: W18A/L*, W24A/L*, W18H*, W24H* WCRVPS3P: W30A/L*, W36A/L*, W30H*, W36H* WCRVPS5P: W42A/L*, W48A/L*, W60A/L*...
Required Control Connections for CRV with Heat Pumps ....... 12 Figure 10 CO Sensor Default and Final Settings Bard Part #8403-067 CO Controller ... 13 Figure 11 Call for Ventilation With or Without Compressor Operation ......18 Figure 12 Call for Compressor or Fan Only with Ventilation Off ........
GENERAL INFORMATION COMMERCIAL ROOM VENTILATOR MODEL NOMENCLATURE WALL MOUNT COMMERCIAL ROOM VENTILATOR PLUG-IN CONNECTION SPRING RETURN CHASSIS SIZE 2 – 1.5 & 2 Ton Models 3 – 2.5 & 3 Ton Models 5 – 3.5 thru 5 Ton Models 6 – 6 Ton Models PARTIAL FLOW P –...
FIGURE 1 Wall Mount Unit Access Panels FILTER TRAY (THIS TRAY IS DISCARDED ONLY FOR WCRVPS2P, WCRVPS3P) EXHAUST COVER PLATE (THIS PLATE IS DISCARDED) CIRCUIT BREAKER ACCESS DOOR BLOWER ACCESS PANEL FILTER...
FIGURE 3 Filter Bracket and Filter Bracket Fill Plate Installation INSTALL FILTER BRACKET FILL PLATE WITH (2) SCREWS (ONLY FOR 2-3 TON UNITS) RIGHT HAND UNIT LEFT HAND UNIT LONG FILTER (4) REGULAR SCREWS LONG FILTER BRACKET BRACKET (4) REGULAR SCREWS SHORT FILTER BRACKET MIS-3863...
Commercial Room Ventilator (CRV) No Hood 4. The next step involves installing the unit’s filter Installation door and putting the mist eliminator filter into place (see Figure 6 on page 8). 1. Insert CRV into opening in the wall mount unit between the filter rack and the condenser section, 5.
FIGURE 5 Damper Assembly Installation CONTROL PANEL (RH SHOWN) FILTER/FILTER RACK THE WIRE HARNESS (12-PIN PLUG END) FROM THIS LOCATION TOP OF OUTDOOR ON THE VENT PACKAGE COIL WILL PLUG INTO THE FRONT SIDE OF THE CONTROL PANEL AFTER SLIDING THE VENT PACKAGE MIS-3862 INTO THE WALL MOUNT, SLIDE IT TOWARD THE CONTROL PANEL SIDE...
CFM rate as set by Potentiometer R2 on the (Bard part #8403-067) to the wall and run additional CRV control board (see Figure 7). Refer to the proper optional wires as shown in the wiring diagrams on chart on pages 14-17 for the airflow to damper position pages 11 and 12.
FIGURE 7 CRV Control Board POT "R2" ADJUST DEMAND VENTILATION WHEN NON- MODULATION CO2 CONTROL CRV CONTROL BOARD SCHEME IS UTILIZED POT "R1" ADJUST MINIMUM OCCUPIED AIRFLOW WHEN NON-MODULATION CO2 CONTROL SCHEM IS UTILIZED POT "R7" ADJUST MINIMUM OCCUPIED AIRFLOW. CAN ONLY BE SET WHEN CO2 CONTROL IS READING BELOW 700 PPM WHEN UTILIZING MODULATING...
W1/E Yellow Blue Orange White Add-on demand Thermostat W1/E YO/D ventilation control Bard #8403-060 Optional CO2 Controller Bard Part #8403-067 24VAC CO2 OUT TEMP-OUT Unit Low B/W1 W3/8 Voltage Term. Strip 12-Pin Vent Plug WCRVPS*P PLUGS IN HERE Factory installed jumper. Remove jumper and connect Demand ventilation control, which could include switched CO2 control, or secondary to N.C fire alarm circuit if emergency shutdown required.
W1/E Yellow Blue Orange White Add-on demand Thermostat YO/D W1/E ventilation control Bard #8403-060 Optional CO2 Controller Bard Part #8403-067 24VAC CO2 OUT TEMP-OUT Unit Low B/W1 W3/8 Voltage Term. Strip 12-Pin Vent Plug WCRVPS*P PLUGS IN HERE Factory installed jumper. Remove jumper and connect Demand ventilation control, which could include switched CO2 control, or secondary to N.C fire alarm circuit if emergency shutdown required.
Page 13
FIGURE 10 Sensor Default and Final Settings Bard Part #8403-067 CO Controller PRESS UP AND DOWN ARROWS TO ENTER CONFIGURATION MODE USE ARROWS TO SELECT SETTING. PUSH MIDDLE BUTTON TO CHANGE. CONTROLLER WILL SHOW SET. NOTE: MENU JUMPER MUST JUMPERS MUST BE BE SET TO "ON"...
BLADE ADJUSTMENT FOR DESIRED Factory Default Settings VENTILATOR AIR Potentiometer R1: 3 The amount of ventilation air supplied by the Potentiometer R2: 6 commercial room ventilator is dependant on four For more accurate adjustment, use a flowhood over factors. the intake opening to measure and adjust the airflow 1.
COMMERCIAL ROOM VENTILATOR Commercial Room Ventilator Sequence of Operation On a call for occupied conditions, CRV opens to a Features position as set by #1 Potentiometer (see Figure 11). • One piece construction – easy to install with no NOTE: These sequence descriptions do not apply if mechanical linkage adjustment required.
FIGURE 12 Call for Compressor or Fan Only with Ventilation Off SUPPLY AIR COOLING COIL AIR FILTER MIST ELIMINATOR OUTDOOR AIR 100% RETURN AIR DAMPER BLADE CONDENSER AIR CONDENSER COIL MIS-3867 Manual 2100-667 Page 19 of 19...