Order Of Pre-Operation Procedures - HYPERVSN Masterbox Operating Manual

Integrated 3d holographic display system
Hide thumbs Also See for Masterbox:
Table of Contents

Advertisement

4. ORDER OF PRE-OPERATION PROCEDURES

Attention.
Before installing or assembling the Masterbox, make a visual check of its
components integrity. The Masterbox should not have any cracks, dents or other visual
damage.
Contact your supplier if you notice any irregularities during the visual check
Pre-operation procedures order
In order to use the Masterbox the following procedures must be performed:
1.
Assemble the Devices.
2.
Mount the Devices according to the Wall installation pattern.
3.
Connect the Devices one by one with signal cables (one signal cable is supplied
with each Device). Use the appropriate sockets at the bottom of the stator.
4.
Activate the Devices.
5.
Upload a media content on the Devices.
Attention.
For more detailed information about steps 1-5 see the operating manuals for
the Device and for the Wall.
6.
Install the Masterbox (see section 5) (optionally).
7.
Assemble the Masterbox (see section 6).
8.
Upload a media content on the Masterbox (see section 7).
Important. If the Masterbox has been stored in low temperatures, leave it indoors
for at least 2 hours before use to avoid moisture condensing on internal
components of the Masterbox. This may damage the Masterbox.
10
SOCKETS
Picture 4. Sockets at the bottom of the stator
© Copyright 2018 HYPERVSN. All rights reserved
.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Masterbox and is the answer not in the manual?

Related Products for HYPERVSN Masterbox

Table of Contents