Dell PowerConnect 8024 Upgrading Firmware page 20

Upgrading from version 2.x.x.x or 3.x.x.x or 4.x.x.x or 5.x.x.x to 5.1.9.3 firmware
Hide thumbs Also See for PowerConnect 8024:
Table of Contents

Advertisement

Upgrading PowerConnect Switches from Version 2.x.x.x or 3.x.x.x or
4.x.x.x or 5.x.x.x to 5.1.9.3 Firmware
- # of sectors per cluster: 4
- # of reserved sectors:
- FAT entry size:
- # of sectors per FAT copy:
- # of FAT table copies:
- # of hidden sectors:
- first cluster is in sector #
- Update last access date for open-read-close = FALSE
Timebase: 66.666666 MHz, MEM: 266.666664 MHz, PCI: 66.666666 MHz, CPU: 533.333328 MHz
PCI unit 0: Dev 0xb314, Rev 0x01, Chip BCM56314_A0, Driver BCM56314_A0
SOC unit 0 attached to PCI device BCM56314_A0
Adding BCM transport pointers
Configuring CPUTRANS TX
Configuring CPUTRANS RX
hpc - No stack ports. Starting in stand-alone mode.
Instantiating /download as rawFs,
Formatting /download for DOSFS
Instantiating /download as rawFs, device = 0x20001
Formatting.../download: file system is marked clean, skipping check
OK.
<186> Apr 6 03:32:10 0.0.0.0-1 General[268434704]: bootos.c(225) 1 %% Event(0xaaaaaaaa)
(Unit 1 - Waiting to select management unit)>
Applying Global configuration, please wait ...
Applying Interface configuration, please wait ...
console>
5. After the switch has finished rebooting, log in and verify that the firmware has been updated to the
version using the show version command. A single switch will typically reboot in around two minutes. A
stack may take significantly longer to complete the upgrade process.
console#show version
System Description................ Dell Ethernet Switch
System Up Time.................... 0 days, 00h:05m:23s
System Contact....................
System Name.......................
System Location...................
Burned In MAC Address............. 5C26.0ACE.D9C7
System Object ID.................. 1.3.6.1.4.1.674.10895.3015
System Model ID................... PCM6220
Machine Type...................... PowerConnect M6220
unit image1
---- ----------- ----------- -------------- --------------
1
5.1.9.3
6. The switch or stack is now ready for normal operation. Verify the configuration and make any changes
needed prior to connecting the switch to the operational network.
1
FAT16
60
2
4
136
device = 0x20001
image2
current-active next-active
2.2.0.3
image1
Page 17
image1
5.1.9.3

Advertisement

Table of Contents
loading

Table of Contents