Hearth and Home Technologies OXDV30SP Installation And Operating Instructions Manual page 10

Direct vent
Table of Contents

Advertisement

Venting Termination Clearances
Your stove is approved to be vented either through the side
wall, or vertical through the roof.
• This unit does not require any opening for inspection
of vent pipe.
• Only HHT and Duravent venting components
specifically approved and labeled for this stove may
be used.
• Minimum clearances between vent pipes and
combustible materials is one (1") inch (25 mm),
except where stated otherwise.
• Venting terminals shall not be recessed into a wall or
siding.
• Horizontal venting must be installed on a level plane
without an inclining or declining slope.
There must not be any obstruction such as bushes, garden
sheds, fences, decks or utility buildings within 24" from the
front of the termination hood.
Do not locate termination hood where excessive snow or ice
build up may occur. Be sure to check vent termination area
after snow falls, and clear to prevent accidental blockage
of venting system. When using snow blowers, make sure
snow is not directed towards vent termination area.
Location of Vent Termination
It is imperative the vent termination be located observing
the minimum clearances located on the following page.
10
Hearth and Home Technolgies • Oxford Direct Vent Installation Manual_R6 • 08/17
Venting Requirements and Options - Direct Vent ONLY
Approved Vent System Components
The heater must be vented to the outdoors through an
adjacent exterior wall or through the roof. The venting
system must be comprised of the appropriate listed venting
components.
This appliance is approved for use with Hearth & Home
Technologies SLP, Simpson Duravent and ICC venting
systems.
3-90-693831

Advertisement

Table of Contents
loading

Table of Contents