Download Print this page

Hisense Hi-Dom Installation, Configuration And Maintenance Manual page 19

Advertisement

Fig. 3.17 Complete issuing configuration of electricity meter address
4. Air Conditioner Adapter Power Supply Input
4.1 Power Supply Input
(1) Firstly, confirm that power normal (DC 12V),H-NET and LAN connection is normal,
then supply power to the machine.
(2) When power supply is input, POWER light of adapter is lightened normally (power
supply indicator) and RUN light (operation indicator) is lightened normally until air conditioner
searching is completed when the RUN light will start flickering.
(3) When air conditioner searching is completed, the RUN light will start flickering. If the
adapter fails to search out air conditioner, STAT will be lightened normally. If at least 1 air
conditioner is searched out, the STAT light won't be lightened.
(4) When
the machine
light will flicker irregularly and RUN light will flicker regularly.
4.2 Reset to Defaults
When it is electrified and RUN light is lightened normally, it can be reset to defaults in the
first 15 seconds. At this time, when long pressing the Reset Button for 4 seconds, the RUN light
will die out. At this time, if stop pressing the Reset Button, the RUN light will flicker, the STST
light will be lighted normally after 2 seconds, and resetting is completed. When electrify again, the
system will be reset to defaults.
※ Conduct air conditioner searching after RUN is lighting for 15 seconds. It is invalid
pressing the RESET button at this time.
※ Reset to default will only empty information of timer and air conditioner locking, ip
address will be recovered to 192.168.1.101, and billing related information won't be emptied.
Fig. 3.16 Electricity Meter Maintenance Page
works normally, POWER light will be lightened normally, H-NET

Advertisement

loading