Download Print this page
wattwatchers Auditor 6M Quick Start Manual
Hide thumbs Also See for Auditor 6M:

Advertisement

Quick Links

Auditor 6M
(Cellular, monitoring-only)
Complete these five easy steps,
then start monitoring your site.
1. Before you begin
2. Connect your Auditor
2. Connect your CTs
3. Use the onboarding tool
5. Validate that your installation is correct
Check here for latest documents:
docs.wattwatchers.com.au
Part #WW018015
Quick
Start
Guide
June 2019

Advertisement

loading

Summary of Contents for wattwatchers Auditor 6M

  • Page 1 Quick Start Guide Auditor 6M (Cellular, monitoring-only) Complete these five easy steps, then start monitoring your site. 1. Before you begin 2. Connect your Auditor 2. Connect your CTs 3. Use the onboarding tool 5. Validate that your installation is correct Check here for latest documents: docs.wattwatchers.com.au...
  • Page 2: Before You Begin

    1. Before you begin What’s in the box: 1 x Auditor 2 x sets of 3 CTs Power connection tails included Green connectors included TAILS GREEN CONNECTOR AUDITOR • Do you have at least 35mm space in the DIN rail mount to fit the Auditor? •...
  • Page 3 2. Connect your Auditor Three-Phase Voltage Connections Use this configuration when there are multiple phases present. The voltage connections are labelled P1, P2, P3, N. Connect voltage phases to P1, P2, and P3. Connect neutral (Black) to N. Single-Phase Voltage Connections Use this configuration when one phase is present.
  • Page 4: Current Transformer Connections

    3. Connect your CTs The included Wattwatchers CTs are connected to the bottom of the Auditor. Only Wattwatchers supplied CTs are supported. It is important to get the direction right when installing CTs. The direction arrow is identified on each CT by the symbol K->L.
  • Page 5 4. Use Setup Tool Use the onboarding tool at onboarding.wattwatchers.com.au to configure and setup your Auditor installation. The onboarding setup tool provides a series of steps to capture details of your setup and provide real-time feedback on the success of the installation.
  • Page 6: Check The Lights

    Need help with your installation? Our team is available from 09:00 to 17:00, Monday to Friday AEDT. Support phone: 02 8316 7540 (+61 2 8316 7540 from overseas) Support: To lodge a Support ticket, please visit our Support Portal at wattwatchers.com.au/support...

This manual is also suitable for:

Ww018015