TESTING 1.0330 Operating Manual

TESTING 1.0330 Operating Manual

Cabinet for moist storage of mortar prisms in triple moulds

Advertisement

Quick Links

TESTING Bluhm & Feuerherdt GmbH
Production and distribution of
construction-material testing devices
Operating Manual
Cabinet for Moist Storage
of Mortar Prisms in Triple Moulds
In accordance with EN 196
1
Motzener Str. 26b
DE - 12277 Berlin
Tel. +49(0)30/710 96 45-0
Fax +49(0)30/710 96 45-98
www.testing.de

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 1.0330 and is the answer not in the manual?

Questions and answers

Summary of Contents for TESTING 1.0330

  • Page 1 TESTING Bluhm & Feuerherdt GmbH Production and distribution of construction-material testing devices Motzener Str. 26b DE - 12277 Berlin Tel. +49(0)30/710 96 45-0 Fax +49(0)30/710 96 45-98 www.testing.de Operating Manual Cabinet for Moist Storage of Mortar Prisms in Triple Moulds...
  • Page 2: Table Of Contents

    After-sales service ....................20 Date of this version of the Operating Manual ............20 Copyright ........................20 Spare parts and technical help .................. 20 Attachments: Declaration of conformity Record of measurement and testing at the manufacturer’s plant Record of temperature and moisture testing...
  • Page 3: Basic Instructions

    The instructions contained in this Operating Manual are intended only for the correct use of the Cabinet for Moist Storage of Mortar Prisms in Triple Moulds. In order to perform the necessary testing correctly, the User must observe the specific standards for such testing.
  • Page 4: Conditions Under Which This System May Not Be Used

    Cabinet for Moist Storage of Mortar Prisms in Triple Moulds 1.0330  This Operating Manual must be considered as a constituent component of the product. It may be used only together with the system with which it has been de- livered.
  • Page 5: Guarantee

    Cabinet for Moist Storage of Mortar Prisms in Triple Moulds 1.0330 Guarantee Our General Terms of Sales and Delivery apply in all cases. The Manufacturer guarantees that this Operating Manual has been prepared in conform- ity with the technical and functional parameters of the Cabinet as delivered. The Manu- facturer reserves the right to add supplementary information to this Operating Manual as required.
  • Page 6: Acceptance Of Delivery And Transport

    Cabinet for Moist Storage of Mortar Prisms in Triple Moulds 1.0330 Acceptance of delivery and transport Acceptance of delivery When accepting delivery of the Cabinet, first inspect it for its outer, visible condition. If this inspection is satisfactory, the machine may be accepted from the freight forwarder (railways, parcel service, or other haulage company).
  • Page 7: Setting Up The Cabinet

    Cabinet for Moist Storage of Mortar Prisms in Triple Moulds 1.0330 Setting up the Cabinet Set up the Cabinet on a surface that is level, that is not subject to vibrations, and that can sufficiently support the weight of the cabinet. Now level the cabinet. Compensate for un- even floors with the adjustable feet.
  • Page 8: Humidifier

    Cabinet for Moist Storage of Mortar Prisms in Triple Moulds 1.0330 Danger: When you are loading the shelves of the Cabinet, make sure that you do not pull out the shelf. If all the shelves are full, and if you pull out all the shelves, there is a danger that the Cabinet will fall over to- ward the front.
  • Page 9: Switching On The Cabinet

    Cabinet. If the officially calibrated testing system measures values that are different from the display on the controller, you must use a correction factor in the controller to change the display reading to match the actually measured values.
  • Page 10: Characteristics Of The System

    Cabinet for Moist Storage of Mortar Prisms in Triple Moulds 1.0330 Characteristics of the system General description of the system The purpose of the Cabinet is to store test samples of mortar prisms in triple moulds, in accordance with EN 196, for use in laboratory and research work. Standard EN 196 stip- ulates a temperature of 20°C ...
  • Page 11 Cabinet. The manufacturer will test and calibrate the Cabinet before it is delivered. The measuring equipment used for this testing and calibration is checked for accuracy at regular intervals by state institutes.
  • Page 12: Open- And Closed-Loop Control Equipment

    Cabinet for Moist Storage of Mortar Prisms in Triple Moulds 1.0330 Open- and closed-loop control equipment The Cabinet automatically controls the temperature and humidity to the values set by the User. It is not necessary for the user to make manual changes to the temperature and humidity.
  • Page 13 Cabinet for Moist Storage of Mortar Prisms in Triple Moulds 1.0330 The controller has three (3) operation levels: Operator level no. 1: Parameterization of the setpoint value: You can directly select the setpoint value for heating by pressing the SET button (regard- less of the standby mode).
  • Page 14: 3.3.1 Messages And Warnings On The Display

    After the Cabinet has been set up, it is necessary to use an officially calibrated reference testing system to measure the exact temperature and humidity that actually occurs inside the Cabinet. This is necessary to compare the actual temperature and the humidity of the interior of the Cabinet with the values being displayed by the system.
  • Page 15: The Humidification System

    Cabinet for Moist Storage of Mortar Prisms in Triple Moulds 1.0330 Then change the value shown here so that it is the same as the value actually measured by the officially calibrated reference sensor. The humidification system The enclosure of the humidification unit contains ultrasonic atomization modules, the so- lenoid valve, and the float switch.
  • Page 16: Maintenance, Care, And Cleaning Of The System

    Cabinet for Moist Storage of Mortar Prisms in Triple Moulds 1.0330 Maintenance, care, and cleaning of the system General instructions It may be necessary to conduct special maintenance work on the Cabinet: for example, repairs, exchange of parts, and any other work that is not described in this Operating Manual.
  • Page 17: Care Of The Indicator Instruments

    Cabinet for Moist Storage of Mortar Prisms in Triple Moulds 1.0330 Changing the filter: Take the filter by the handle.Turn it 90 ° to the left or right and re- move. Inserting the filter: Insert with the handle in a vertical position. Turn it 90 ° to the left or right until it clicks into place.
  • Page 18: Troubleshooting

    Cabinet for Moist Storage of Mortar Prisms in Triple Moulds 1.0330 Troubleshooting Important: Any work done on the electrical components or systems must be performed by qualified specialist personnel. Status and error messages on the controller Message Description Action to be taken Standby mode.
  • Page 19: Placing The System Out Of Operation

    Cabinet for Moist Storage of Mortar Prisms in Triple Moulds 1.0330 TROUBLE CAUSE SOLUTION The humidifier is producing too much The controller settings are not correct. moisture. Get in touch with the manufacturer. The humidifying pipes are not in their Get in touch with the manufacturer.
  • Page 20: After-Sales Service

    Oct. 2017 Copyright The copyright to this Operating Manual is held by: TESTING Bluhm & Feuerherdt GmbH This Operating Manual is intended for use only by the User and his/her staff. It contains instructions and data that may NOT be: ...
  • Page 21 EC Declaration of Conformity in accordance with the Machinery Directive 2006/42/EC Appendix II 1.A The authorised representative established in the community, Mr. Feuerherdt hereby declares that the following product Manufacturer: TESTING Bluhm & Feuerherdt GmbH Motzener Str. 26b 12277 Berlin Product designation: 1.0330 Serial number:...
  • Page 22 Cabinet for Moist Storage of Mortar Prisms in Triple Moulds 1.0330...

Table of Contents