Payne C Series Installation, Start-Up, Operating And Service And Maintenance Instructions page 39

Single-stage 4-way multipoise condensing gas furnace
Table of Contents

Advertisement

BLOWER OFF-DELAY
J2 JUMPER
24-V THERMOSTAT
TERMINALS
3-AMP FUSE
LED OPERATION &
DIAGNOSTIC LIGHT
115-VAC(L2)NEUTRAL
CONNECTIONS
COOL
HEAT
SPARE-1
BLOWER SPEED
SELECTION TERMINALS
TWINNING AND/OR
COMPONENT TEST
TERMINAL
BLOWER OFF-DELAY
TEST/TWIN
HUM
0.5 AMP@24VAC
FUSE 3-AMP
SEC-2 SEC-1
EAC-2
L2
EAC-1 TERMINAL
(115-VAC 1.0 AMP MAX.)
SPARE-1 SPARE-2
SPARE-3
SPARE-2
VOLTAGE CONNECTION
SP ARE-3
Fig. 40 − Example of Single Stage Furnace Control
PR-1
PL2
1
115 VAC (L1) LINE
39
HUMIDIFIER TERMINAL
(24-VAC 0.5 AMP MAX.)
TRANSFORMER 24-VAC
CONNECTIONS
PL1-LOW VOLTAGE MAIN
HARNESS CONNECTOR
PL2-HOT SURFACE
IGNITER & INDUCER
MOTOR CONNECTOR
A11619

Advertisement

Table of Contents
loading

Table of Contents