Download Print this page

ZALMAN ZM-WB5 Plus User Manual page 14

Cpu water block for higher water cooling performance

Advertisement

2-Ⓒ) Installation on AMD Socket AM3 / AM2+ / AM2 / 754 / 939 / 940
Set the CPU Water Block at the center of the CPU and hook the flat side of the clip onto the
motherboard clip support. Complete installation by exerting downward force on the levitated side
of the Clip until both sides are hooked and fastened.
3) Tube Connection
Use a pair of wire pincers or pliers to unfasten the Tube Clamps, and insert the Tubes. Connect and
fasten to the cooler as shown in the diagram.
Caution
▶ Please refer to the Pre-Installation Verification on Page 3 to prevent the reversal of the
Inlet and Outlet Tube Connections.
▶ Please make sure to use compatible Tube Clamps for the tube's diameter and
adjust the insertion depth accordingly.
Tube Clamp A
(13.8 x 9.5mm)
14 x 10mm, 13 x 10mm
▶ Please test run the pump after installation to ensure proper operation.
Tube Clamp B
(11.5 x 8mm)
13 x 9mm, 12 x 9mm, 12 x 8mm
11 x 9mm, 11 x 8mm
6

Advertisement

loading