Black & Decker Price Pfister 16 Series Manual page 3

Handheld shower package
Hide thumbs Also See for Price Pfister 16 Series:
Table of Contents

Advertisement

Available languages

Available languages

7
7C
7D
SMOOTH SURFACE
7C
7E
7F
7D
UNEVEN SURFACE
7G
7 WALL MOUNT INSTALLATION
Vertically align Wall Mount (7A) below Shower Arm (7B) and place in a desired
location.
SMOOTH SURFACE: Loosen Suction Cup (7C) by turning it counterclockwise. Attach
Post (7D) by pressing it against wall surface allowing Suction Cup (7C) to compress.
Tighten Post (7D) by turning it clockwise until it is properly positioned and fixed firmly
to the wall.
UNEVEN SURFACE: Incase Wall Mount (7A) falls next to a tile grout line, or the wall
surface is not smooth, attach one end of Adhesive Backing (7E) to Suction Cup (7C) by
removing a Protective Seal (7F). Remove the other Protective Seal (7G) from Adhesive
Backing (7E) and attach Post (7D) to wall surface. Allow drying for 12 hours.
Connect Post (7D) into Wall Mount Shell (7G) and secure by screwing Fastener (7H).
8
8B
8C
8A
7B
7E
7F
7G
7D
7A
7H
8D
ENGLISH
8 SHOWER HEAD INSTALLATION
Thread Shower Head (8A) onto Shower Diverter (8B). Make sure Rubber Seal (8C) is
retained inside Shower Nut (8D).
Make sure Shower Head (8A) is securely tightened to Shower Diverter (8B).
9
9 HOSE INSTALLATION
Place Rubber Seal (9A) inside Ribbed Hose Fitting (9B). Connect Hose (9C) onto the
bottom end of Slide Bar (9D) by turning Ribbed Hose Fitting (9B) clockwise.
10
10 HAND SHOWER INSTALLATION
Place Rubber Seal (10A) inside Conned Hose Fitting (10B). Connect Hand Shower
(10C) to Hose (10D) by turning Conned Hose Fitting (10B) clockwise.
Make sure Hand Shower (10C) is securely tightened to Hose (10D).
3
9D
9A
9B
9C
10C
10A
10B
10D

Advertisement

Table of Contents
loading

Table of Contents