Download Print this page
Riverside Furniture Allegro Home Office 44728 Assembly Instructions

Riverside Furniture Allegro Home Office 44728 Assembly Instructions

L return desk

Advertisement

Quick Links

Riverside
FURNITURE
email: info@riverside-furniture.com
Components and Hardware List
Grommet
Flat Washer
A
B
3 pcs.
10 pcs.
Key
Bun Foot
W/ Leveler
F
G
1 Set.
11 pcs.
Be sure to check all packing material carefully for small parts, which may have come
loose inside the carton during shipment.
Step 1: Place the return desk on a clean, soft surface such as a blanket or carpet.
Assemble the four Bun Feet (G) onto the Bottom. Carefully set it upright.
Step 2: Assemble the Back Panel to
the Return Desk, using Allen-Head
Bolts (D) Spring Washers (C) and
Flat Washers (B). Tighten the Allen
Bolts using the Allen Wrench (D).
Step 3: Remove the middle drawer
from the drawer Pedestal (see
below).
Step 4: Assemble the Top Panel to
the Return Desk, using Allen-Head
Bolts (D) Spring Washers (C) and
Flat Washers (B). Tighten the Allen
Bolts using the Allen Wrench (D).
Step 3
With the drawer fully open, the
drawer slides must be released by
pressing the black lever located in
the slide either up or down,
depending on which slide is being
released. With both levers pressed,
gently pull the drawer until the
slides release.
Carefully reinstall the drawers by
aligning the channels of the
drawer slides and gently pushing
the drawers back into the cabinet.
Allegro Home Office
Assembly Instructions
Lock Washer
Allen Head Bolt
1/4" x 1-1/2"
C
D
10 pcs.
10 pcs.
Wood Shelf
Shelf Pin
H
I
1 pc.
4 pcs.
Made in China
4 mm Allen
Wrench
E
1 pc.
File rod
44728 L Return Desk
J
2 pcs.
G
Page 1 of 3
Step 1
D
D

Advertisement

loading

Summary of Contents for Riverside Furniture Allegro Home Office 44728

  • Page 1 Riverside Page 1 of 3 Allegro Home Office Made in China Assembly Instructions FURNITURE email: info@riverside-furniture.com Components and Hardware List Grommet Flat Washer Lock Washer Allen Head Bolt 4 mm Allen 1/4" x 1-1/2" Wrench 3 pcs. 10 pcs. 10 pcs. 10 pcs.
  • Page 2 Riverside Page 2 of 3 Allegro Home Office Made in China Assembly Instructions FURNITURE email: info@riverside-furniture.com Components and Hardware List Step 5: Place the L Desk on a clean, soft surface such as a blanket or carpet. Remove and discard the shipping rails attached to the bottom of the Desk.
  • Page 3 Riverside Page 3 of 3 Allegro Home Office Made in China Assembly Instructions FURNITURE email: info@riverside-furniture.com Components and Hardware List Step 7: Open the Door and insert Shelf Pins (I) into holes in side panels at the desired locations. Then place Wood Shelf (H) on the shelf pins.