This copyright does not indicate that this work has been published. This material, information and instructions for use contained herein are the property of Esko-Graphics Kongsberg AS. There are no warranties granted or extended by this document. Furthermore, Esko-Graphics Kongsberg AS does not warrant, guarantee or make any representations regarding the use, or the results of the use of the system or the information contained herein.
Kongsberg XE 2. Change record Description Date dd-mm-yyyy 20.06.2014 JHBE First edition of this document 02.05.2016 JHBE Certificates updated 13.11.2018 New certificates and other minor updates. 03.06.2020 Safety sections updated. Declarations and statements updated. 23.09.2020 Section FCC conformity statement removed.
Kongsberg XE 3. Introduction 3.1. Welcome Welcome to a long-lasting co-operation with Esko. This How to get started manual is a brief introduction to the system you are about to receive. It should stay available to operators all time. 3.2. System Label A System Label is available from: •...
Kongsberg XE 4. General Information 4.1. Where to find information The following documentation is available for the equipment: Title Target personnel Media Language Purpose How to get started Customer Local and US Shortform manual introduction How to get started Customer...
From the help menu in iPC, user manuals for cutting table and iPC are available online. These are updated regularly. Factory installed PCs have All documentation loaded to C:\Users\Public\Documents\Esko documentation. This folder can also be accessed from the help menu. The content is sorted on available languages.
Get the best out of iPC is available in US version online, and contains advice on how to prepare different types of jobs from design, prepress and to finishing. 4.4. Installation Esko Authorized Personnel only are allowed to install the equipment. 4.4.1. What is received The delivery is specified in a Packing List following the shipment.
Kongsberg XE Switch on the PC and the monitor. Table Power Switch the table on using the Main Power Switch. Note: After power off, wait minimum 5 sec. before the system is switched on again. Xx-Guide Use the mouse, double-click the icon for XE-Guide.
Kongsberg XE 4.5.3. Power Off Sequence Follow these steps to power down the system: Servo Power Press the Servo On pushbutton to switch Servo Off. Table Power Turn Table Power off using the Main Power Switch. Note: After power off, wait minimum 5 sec. before the system is switched on again.
Maintenance done by the customer is limited to simple, preventive maintenance and cleaning. This is described in the User manual as well as in the Maintenance manual. Any other maintenance, repair, replacement of parts etc. must be done by Esko authorized personnel only.
Kongsberg XE 5. Safety Issues Your Kongsberg system is built for high speed and productivity. Danger zones are designed away as far as practically possible. Still, the system represents potential hazard if operating procedures and safety precautions are not followed.
Note: We remind you that only the Esko Staff, or persons having received appropriate training, are allowed to handle, manipulate or do repairs on the system. Training will be given to the customer appointed operator(s) by the Esko Service Engineer as part of the installation.
Need help?
Do you have a question about the Kongsberg XE and is the answer not in the manual?
Questions and answers