Page 1
® ® Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide Stratus Technologies R627-04A...
Page 2
Software described in Stratus documents (a) is the property of Stratus Technologies Bermuda, Ltd. or the third party, (b) is furnished only under license, and (c) may be copied or used only as expressly permitted under the terms of the license.
Contents Preface 1. Site Planning for ftServer 2510, 4410, and 6210 Systems Site Planning Overview Site Planning for Fault-Tolerant Systems Site Planning Checklist System Documentation Safety Notices 1-11 2. Electrical Power Planning Redundant Power Sources AC Power and HVAC Service Requirements...
Page 4
Grounding Considerations Circuit Wiring Diagrams Electrical Power Connectors Appendix C. Standards Compliance Electronic Interference, Immunity, Safety, and Noise Level Standards Compliance Toxic and Hazardous Substances and Elements Disclosure Index Index-1 Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Page 5
Direct-Attach Fibre Channel Connections to an ftScalable Storage System Figure 6-1. Rail Clearance Figure A-1. Pedestal ftServer 2510 or 4410 System: Front View Figure A-2. Pedestal ftServer 2510 or 4410 System (No VTMs): Rear View Figure A-3. Pedestal ftServer 2510 or 4410 System (With VTMs): Rear View Figure A-4.
Page 6
Customer-Supplied Ethernet Cables Table 4-4. Null Modem Cables Table 5-1. Current and Rack-Space Requirements Table 5-2. Calculating A-Side PDU and Rack-Space Requirements Table 5-3. Sample: Current and Rack-Space Requirements Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Page 7
Table A-2. Cabinet Dimensions Table A-3. Rack-Mountable ftServer 2510, 4410, and 6210 System Specifications Table A-4. AAP87600 and AAP86900 PDU: Specifications A-14 Table B-1. Connectors for AC Power Outlets Table C-1. Compliance Standards for ftServer 2510, 4410, and 6210 Systems Tables...
Page 8
Tables viii Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Preface The Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627) documents the site requirements and customer responsibilities related to preparing a site for the installation of ftServer 2510, 4410, and 6210 systems. This document is intended for those responsible for preparing a site for the installation of an ftServer 2510, 4410, or 6210 system.
Page 10
Center (CAC) at (800) 221-6588 or (800) 828-8513, 24 hours a day, 7 days a week. – If you are located outside North America, contact your nearest Stratus sales office, CAC office, or distributor; for CAC phone numbers outside the U.S., see http://www.stratus.com/support/cac/index.htm.
Page 11
If you are unable to resolve your questions with the help available at these online sites, and the ftServer system is covered by a service agreement, please contact the Stratus Customer Assistance Center (CAC) or your authorized Stratus service representative.
Page 12
Preface Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Site planning for fault-tolerant systems includes: Purchasing an appropriate cabinet and monitor If you do not purchase a monitor from Stratus, provide a monitor that meets the system’s requirements. N O T E S 1. A monitor, keyboard, and mouse are required to install ftServer System Software (ftSSS).
If your system is covered by a service agreement and you need help with site planning, contact the Stratus Customer Assistance Center (CAC) or your authorized Stratus service representative. If you have a contract with the CAC or your authorized Stratus service representative to install the system, contact them after you have prepared the...
ftServer systems can connect to the ActiveService Network (ASN). Connecting a system to the ASN allows the CAC or your authorized Stratus service representative to remotely diagnose, troubleshoot, and resolve problems online. To enable connectivity to the ASN, an ASN modem can be attached directly to the system.
U574F-LC Dual-Port Fiber Gigabit Ethernet Adapter U575F Dual-Port Copper Gigabit Ethernet Adapter N O T E The four embedded physical adapters provide the basic requirements for VMware ESX: two adapters are Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Page 17
Planning for Optional Components ❏ Will you supply your own monitor or will Stratus supply the monitor, keyboard, and mouse? Is the monitor rack-mountable or do you need to provide a table or desk?
Page 18
Location of the system and its external components Power cords, and telephone and interface cables Locations of AC power receptacles, phone jacks, Ethernet jacks, switches, and hubs Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
If you have any questions about the number and types of components, contact your Stratus account representative or distributor. System Documentation Table 1-2 lists the hardware documents for ftServer 2510, 4410, and 6210 systems, and the tasks described in each document. Also see Table 1-3 (for Windows systems),...
Page 20
Start the system for the first time Read Me First: Unpacking ftServer 2510, Inspect and unpack ftServer system hardware that you 4410, and 6210 Systems (R629) install in your cabinet Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
System Documentation Table 1-3 lists additional documents for ftServer 2510, 4410, and 6210 systems that run ftSSS for the Windows Operating System, and the tasks described in each document. Table 1-3. Additional System Documentation for Windows Systems Document Task Release Notes: Stratus ftServer System...
System Documentation Table 1-4 lists additional documents for ftServer 2510, 4410, and 6210 systems that run ftSSS for the Linux Operating System, and the tasks described in each document. Table 1-4. Additional System Documentation for Linux Systems Document Task Release Notes: Stratus ftServer System...
W A R N I N G To prevent a cabinet from tipping over and injuring a person or damaging the system, start installing systems from the bottom of the cabinet upward. Site Planning for ftServer 2510, 4410, and 6210 Systems 1-11...
Page 24
Avoid the following conditions to avoid the risk of fire: • Dust • High humidity, such as a place near a boiler 1-12 Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Page 25
Site Planning for ftServer 2510, 4410, and 6210 Systems 1-13...
Page 26
Do not leave the DVD tray ejected. Dust may enter the equipment and cause it to malfunction. The ejected tray may also become a cause of injuries. W A R N I N G 1-14 Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Page 27
Safety Notices W A R N I N G W A R N I N G W A R N I N G W A R N I N G Site Planning for ftServer 2510, 4410, and 6210 Systems 1-15...
Page 28
Safety Notices W A R N I N G W A R N I N G W A R N I N G 1-16 Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Chapter 2 Electrical Power Planning For information about planning appropriate AC electrical power for your system and its peripheral components, see: “Redundant Power Sources” on page 2-1 “AC Power and HVAC Service Requirements” on page 2-2 “Selecting a UPS Unit for ftServer Systems” on page 2-9 ...
AC Power and HVAC Service Requirements AC Power and HVAC Service Requirements From the Stratus ftServer Systems: Peripherals Site Planning Guide (R582), obtain the nominal input line voltage (volts AC) and frequency (Hz) required for optional, AC-powered components. In general, provide 100–240 VAC at 50 or 60 Hz for optional components.
User-supplied components TOTAL A-SIDE POWER REQUIREMENTS † See the Stratus ftServer Systems: Peripherals Site Planning Guide (R582) for the wattage of optional components you purchase from Stratus. ‡ If you are using Fibre Channel switches to connect the systems to storage enclosures, include on this line the power requirements for a Fibre Channel switch.
TOTAL NUMBER OF A-SIDE POWER OUTLETS Table 2-6. Worksheet: B-Side External Power Outlet Requirements: PDUs Used Component Quantity Outlets Subtotal PDUs Other external components TOTAL NUMBER OF B-SIDE POWER OUTLETS Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
AC Power and HVAC Service Requirements If you do not use PDUs in the cabinet, use Tables to determine the number of AC power outlets required outside the cabinet. 1. In the Quantity column, write the number of each type of component. 2.
PDUs directly to two separate power sources. Figure 2-1. Rack-Mounted System Connected Directly to AC Power B-side power cord A-side power cord AC power outlets Circuit breakers (maximum of 20A) Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
AC Power and HVAC Service Requirements Figure 2-2. Pedestal System Connected Directly to AC Power fhsys043 A-side system power cord B-side system power cord AC power outlets Circuit breakers (maximum of 20A) Electrical Power Planning...
Figure 2-3. PDUs Connected Directly to AC Power fhsys046b A-side PDU B-side PDU B-side jumper cables A-side jumper cables PDU power cords AC power outlets Circuit breakers (maximum of 20A) Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Selecting a UPS Unit for ftServer Systems Selecting a UPS Unit for ftServer Systems Stratus does not sell or service UPS units. However, Stratus has qualified UPS models for use with ftServer 2510, 4410, and 6210 systems. Table 2-1 to determine the number of watts the A-side of your system requires and...
Nominal Voltage AC Power Output North America Model SUA1500 120V 120V or 208V Japan Model SUA1500J 100V 100V Rest of the world Model SUA1500I 230V 230V or 240V 2-10 Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
When you install your ftServer system, download PowerChute Network Shutdown from APC, and install and configure the tool on the system, as described in the Stratus ftServer System Software: Installation and Configuration for Windows Systems (R002W). PowerChute Network Shutdown monitors the UPS for an imminent power loss, and initiates a shutdown of the system before power is lost.
B-side system power cables (black) A-side system power cables (gray) PDU power cords UPS power cord AC power outlets AC power (mains) distribution circuit breaker (maximum of 20A) 2-12 Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Selecting a UPS Unit for ftServer Systems Connecting a System Directly to a UPS You can connect the A-side power connectors of your system directly to a UPS, as shown in Figure 2-5 Figure 2-6. Figure 2-5. Rack-Mountable Systems: A-Side Power Connected Directly to a UPS fhsys044 B-side system power cord A-side system power cord...
Figure 2-6. Pedestal Systems: A-Side Power Connected Directly to a UPS fhsys045 B-side system power cord A-side system power cord UPS power cord AC power outlets Circuit breakers (maximum of 20A) 2-14 Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Power Cord Summary Power Cord Summary Stratus supplies tested and approved AC power cords for the following components: ftServer systems and peripheral components PDUs W A R N I N G Place all power cords out of the way of foot traffic.
Plug Type Rating Length Locale B50154F IEC 60320 C19 to IEC 60309 20A/250V 15 ft International B50171F IEC 60320 C19 to NEMA L6-20P 16A/250V 15 ft North America 2-16 Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Grounding Requirements Table 2-14. Power Cords to Connect PDUs Directly to AC Power Mains (Continued) B50175 IEC 60320 C19 to NEMA L6-20P, 20A/250V 15 ft Japan locking PSE approved power cord Table 2-15. AC Power Cords to Connect PDUs to a UPS Marketing ID Plug Type Rating...
Page 46
Grounding Requirements 2-18 Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Chapter 3 Space Planning For information about planning sufficient space for your ftServer system, see: “Room Requirements” on page 3-1 “Planning for Cables” on page 3-3 Room Requirements To ensure that the installation site provides a properly equipped, cooled, and sized environment, make sure that the site: ...
Page 48
Do not locate components near transformers or other electromagnetic devices. Appendix A, “System Specifications” and Stratus ftServer Systems: Peripherals Site Planning Guide (R582) for the dimensions of system components. Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
“Power Cord Summary” on page 2-15 Chapter 4, “Communications Line Planning” “Monitor Requirements” on page 6-4 Stratus ftServer Systems: Peripherals Site Planning Guide (R582) for information about cable lengths for peripheral components Space Planning...
Page 50
Planning for Cables Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
2. If you have a unique network requirement, contact Stratus Professional Services. For a list of available services, see http://www.stratus.com/services/ps/offerings.htm. 3. See the Stratus ftServer Systems: PCI Adapter Guide (R461) for more information about the adapters Stratus supplies for your ftServer system. Communications Line Planning...
Table 4-1. Single-Initiated SCSI Tape Cables Length Part number 10 ft (3.05m) AW-001046-01 30 ft (3.05m) AW-001046-02 Figure 4-1. SCSI Connections to Tape Drives System Tape fhsys054a Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
CPU- I O enclosure: one in the top enclosure and the other in the bottom enclosure. The Stratus ftServer Systems: Peripherals Site Planning Guide (R582) lists the optical Fibre Channel HBAs supported by each operating system.
Ethernet Cables Figure 4-3. Direct-Attach Fibre Channel Connections to an ftScalable Storage System CPU-I/O Enclosure 10 CPU-I/O Enclosure 11 ftScalable Storage RAID Controller Tray 1 ftScalable Storage RAID Controller Tray 2 fhsys053 Ethernet Cables In addition to the Ethernet cables listed in this section, you must also plan to provide network connection points.
328 ft (100m). straight-through cable. For 100- or 1000-Mbps (fast Ethernet) operation, provide full-duplex, or Category-5 Ethernet cables. Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Page 57
Ethernet Cables Table 4-3. Customer-Supplied Ethernet Cables (Continued) Marketing Component Quantity ID/Cable Length Cable Type U574F-LC Dual-Port 1 for each N/A. You must Multimode, 62.5- or 50-micron, 1000Base-SX Fiber port, typically supply these DUAL fiber cable with LC-type Ethernet PCI Adapter teamed for cables.
N/A. You must system backplane asynchronous null modem cable for provide this cable; connecting the PC console to the COM2 port obtain the length for on the system your planning Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
If your system will connect to a network with Internet access, you may choose to use the Internet to send alarms to the ASN and allow the CAC or your authorized Stratus service representative to connect to your system over the Internet for troubleshooting.
– Slave systems that have VTMs in a group with an ftGateway system that has VTMs Using VTMs provides the highest level of manageability by allowing the system to be serviced even when the operating system is not operational. 4-10 Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Modem Requirements for Brazil ® The ANATEL mark for telecom is required in Brazil. The Multi-Tech modem located in the Stratus ASN modem assembly does not have this agency mark. Therefore, Stratus cannot ship this modem to Brazil. Communications Line Planning 4-11...
Page 62
Modem Requirements for Brazil 4-12 Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Correspondingly, two power distribution units (PDUs) provide power to the receptacles. Use of PDUs is optional unless you have a support agreement with Stratus. If you do have a support agreement with Stratus, use pairs of PDUs to provide AC power to systems and components in a cabinet if six or more power cords would otherwise exit from the cabinet.
Tape-drive enclosure † Disk-storage enclosure † See the Stratus ftServer Systems: Peripherals Site Planning Guide (R582) for the wattage and rack requirements of your monitor, tape drive, and disk-storage solutions. Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Determining PDU Requirements To complete Table 5-2 1. In column 1, write the names of each system or component in the rack. If you have more than one system, use a row for each system. 2. In column 2, write the cumulative number of rack units (Us): Add the number of Us (see Table 5-1) for the component to the value in the space above and write the...
PDU pair 0.00 ftServer system 3.91 1U LCD monitor unit 4.23 Tape drive enclosure 4.71 ftScalable Storage system 7.12 ftServer system 11.02 ftServer system 14.93 PDU pair ftServer system 3.91 Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Page 67
The total number of outlets required In this example, two PDUs can provide enough current for the LCD monitor unit, one tape drive enclosure, one ftScalable Storage system, and three ftServer 2510, 4410, or 6210 systems. This set of components consumes 14.93 amperes; adding another system would increase the consumption to 17.94 amperes.
Page 68
Sample PDU Usage Calculation Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
The cabinet can support the weight of all the components you plan to install in it. Appendix A and the Stratus ftServer Systems: Peripherals Site Planning Guide (R582) provides the weights of components supplied by Stratus. Cabinet and Monitor Requirements...
Page 70
If your cabinet does not have vented front and rear doors, you can remove the doors from the cabinet while your ftServer system is operating. The final installation conforms to all emission, immunity, safety, and other applicable regulations. Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Cabinet Requirements Figure 6-1 shows the required rail clearance between the front vertical rails and the inside edge of an accessory leg. Figure 6-1. Rail Clearance 0.5-inch (1.27-cm) 0.5-inch minimum minimum msys182 Front vertical EIA rail Accessory leg Front of cabinet Cabinet and Monitor Requirements...
Monitor Requirements Monitor Requirements If you are using a monitor that is not supplied by Stratus, make sure that: The monitor accepts universal 100–240 volts AC (VAC), 50/60 Hertz (Hz) power. The VGA cable has a 15-pin D-sub connector.
Page 73
Pedestal System Specifications The following figures show front and rear views of the systems. Figure A-1 shows the front of a pedestal ftServer 2510 or 4410 system, its bezel pulled forward. Figure A-2 shows the rear of a pedestal ftServer 2510 or 4410 system with no VTMs, specifying the locations of the connectors at the back of the system.
Pedestal System Specifications Figure A-1. Pedestal ftServer 2510 or 4410 System: Front View asys006a Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Pedestal System Specifications Figure A-2. Pedestal ftServer 2510 or 4410 System (No VTMs): Rear View fhsys007a Ports on a PCI adapter in slot 1 System 10/100/1000-Mbps Ethernet ports (4) Modem and telephone cord port USB ports (3) VGA (monitor) port...
Pedestal System Specifications Figure A-3. Pedestal ftServer 2510 or 4410 System (With VTMs): Rear View fhsys007b Ports on a PCI adapter in slot 1 System 10/100/1000-Mbps Ethernet ports (4) Modem and telephone cord port USB ports (3) VGA (monitor) port...
Pedestal System Specifications Table A-1. Pedestal ftServer 2510 or 4410 System Specifications Power Input power 650W for each enclosure (1300W total) Nominal input voltage (AC) 100-127 or 200-240 volts; 50/60 Hz Protective earth ground current maximum for each AC power cord...
Page 78
For more information about explicitly enabling this drive after installation, see the Stratus ftServer System Administrator’s Guide for VMware vSphere (R002E). † Accommodates x1 through x8 PCI-Express cards. Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Rack-Mountable System Specifications The following figures show front and rear views of the systems. Figure A-4 shows the front of a rack-mountable ftServer 2510, 4410, or 6210 system, mounted in a rack with its bezel pulled forward. Figure A-5 shows the rear of a rack-mountable ftServer 2510, 4410, or 6210 system, specifying the locations of the connectors at the rear of the system.
Rack-Mountable System Specifications Figure A-5. Rack-Mountable ftServer 2510, 4410, or 6210 System (With VTMs): Rear View fhsys034 PCI slot 1 System 10/100/1000-Mbps Ethernet ports (4) USB ports (3) VGA (monitor) port Serial (COM) ports (2) Power receptacles (2) VTM 10/100-Mbps Ethernet ports (2) VTMs are optional components on Windows and Linux systems, so the Ethernet ports for them are not functional if VTMs are not present.
344 lb (156 kg) Weight, empty with pallet and shipping container 512 lb (232.2 kg) Weight capacity 1500 lb (559.9 kg) Table A-3. Rack-Mountable ftServer 2510, 4410, and 6210 System Specifications Power Input power 650W for each enclosure (1300W total) Nominal input voltage 100-127 or 200-240 volts;...
Page 82
Rack-Mountable System Specifications Table A-3. Rack-Mountable ftServer 2510, 4410, and 6210 System Specifications (Continued) Environmental Operating temperature F to 95 F (5 C to 35 For every 800 ft (243.8 m) above 2000 ft (609.6 m), lower the ...
Page 83
Rack-Mountable System Specifications Table A-3. Rack-Mountable ftServer 2510, 4410, and 6210 System Specifications (Continued) PCI slots One of the following: • Two full-height-capable PCI-X 64-bit, 100MHz slots, and one low-profile PCI-X, 64-bit, 133MHz slot • Two full-height-capable slots: one PCI-Express (x4 connector) 2.5Gbps slot and one PCI-X 64-bit, 133MHz slot;...
A power distribution unit (PDU) optionally supplies power to rack-mounted ftServer systems and optional rack-mountable components. Figure A-6 shows the AAP86900 PDU and Figure A-7 shows the AAP87600 PDU. Figure A-6. AAP86900 PDU pdu006 Power switch Power receptacle A-12 Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Storage temperature to 40,000 ft F to 140 F (-40 C to 60 (12.2 km) Relative humidity during storage 5% to 95% (noncondensing) A-14 Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Appendix B Electrical Circuit and Wiring Information For electrical circuit and wiring information that you need to provide to the contractor and/or facilities personnel responsible for wiring the power at the system installation site, see: “Fault Protection Requirements” on page B-1 ...
380V AC, Y-, or -source circuit connection, phase-to-neutral. In the following diagrams, the power inputs for ftServer 2510, 4410, and 6210 systems are labeled X and Y, as shown in Figure B-2, to eliminate any ambiguities in the nomenclature.
Circuit Wiring Diagrams hot input, and the Y input is connected to the N (Neutral) input. However, for split-phase or three-phase applications, the X and Y inputs are connected to L1, L2, or L3 (separate lines). Therefore, for split-phase or three-phase applications, both X and Y can be electrically hot with respect to the system base (earth reference ground).
Figure B-4. Single-Phase 240V AC Circuit Connection Circuit A or B 240V G (PE) Single system: 20A maximum PDU: 20A maximum Wall Power Cord G (PE) To power input A or B Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Circuit Wiring Diagrams Figure B-5 shows a split-phase 120/240V AC circuit connection. Note that this application requires a double-pole circuit breaker. Figure B-5. Split-Phase 120/240 Volts AC Circuit Connection 240V Circuit A or B 120V 120V G (PE) Single system: 20A maximum PDU: 20A maximum Wall Power Cord...
208V 120V 208V 120V Circuit A or B 120V G (PE) Single system: 20A maximum PDU: 20A maximum Wall Power Cord G (PE) To power input A or B Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Circuit Wiring Diagrams Figure B-7 shows a three-phase 380V AC, Y-, or -source circuit connection, which is a phase-to-neutral source connection. Note that the system’s X input can be connected to L1, L2, or L3. This application requires a single-pole circuit breaker. Figure B-7.
Appendix C Standards Compliance For compliance information, see the following: “Electronic Interference, Immunity, Safety, and Noise Level Standards Compliance” on page C-1 “Toxic and Hazardous Substances and Elements Disclosure” on page C-4 Electronic Interference, Immunity, Safety, and Noise Level Standards Compliance All ftServer systems comply with the electromagnetic interference (EMI), immunity, safety, and noise regulations listed in...
WARNING: Changes or modification to the product could void the user's authority to operate the equipment. Table C-1. Compliance Standards for ftServer 2510, 4410, and 6210 Systems Standard Title...
Page 99
Electronic Interference, Immunity, Safety, and Noise Level Standards Compliance Table C-1. Compliance Standards for ftServer 2510, 4410, and 6210 Systems (Continued) Standard Title Country STQC–Safety Certification Safety of Information Technology Equipment India (S-Mark) Scheme IEC 60950-1:2001 VCCI V-3 (2006.04) Class,...
Toxic and Hazardous Substances and Elements Disclosure BSMI Note Toxic and Hazardous Substances and Elements Disclosure ftServer 2510, 4410, and 6210 systems are compliant with the European Union’s Restriction of Hazardous Substances Directive (RoHS) based upon the exception for lead used in servers.
Page 101
Index Index- compliance, standards, C-1 connectors, electrical, B-8 AC power service requirements, 2-2 ActiveService Network (ASN). See ASN UPS, 2-14 APC UPS, 2-14 current requirements, from PDU, 5-2 Network Management Card EX, 2-11 Customer Assistance Center. See CAC PowerChute Network Shutdown, 2-11 qualified models, 2-10 qualified Symmetra models, 2-9 AS/NZS 3112-1993 connector, B-9...
Page 102
SAA/3/15 AS/NZS 3112-1993 connector, B-9 SABS 164-1:1992 connector, B-9 safety optical Fibre-Channel connections, 4-3 notices, 1-11 SCSI cables, 4-2 SCSI connections to tape drives, 4-2 serial cables, 4-8 service requirements, AC-power, 2-2 Index-2 Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Page 103
VTMs, site planning, 1-3 120–240 V AC, B-5 standards compliance, C-1 star ground, B-2 wiring, electrical, B-1 Stratus Customer Assistance Center. See CAC switches Ethernet cable planning, 3-3, 4-6, 4-7 Fibre Channel, 1-5 cable planning, 4-4 power...
Page 104
Index Index-4 Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide (R627)
Need help?
Do you have a question about the ftServer 2510 and is the answer not in the manual?
Questions and answers