Preparatory Measures; Mains Adapter; Compressed Air Supply - Aventics Essential-Test-Box Operating Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 19
26
AVENTICS | ES05 | R415017129–BAL–001–AA

Preparatory measures

4
Preparatory measures
4.1

Mains adapter

1. On the plug power pack (fig. 1, 8), assemble the adapter compatible with your network
connection.
2. Plug the power pack into the socket and connect the 24 V plug to the switch box (fig. 1, 12).
Fig. 2:
Assembling the mains adapter
4.2

Compressed air supply

O
Connect the control module to your compressed air supply (min. 7 bar). (Lock coupling 7.2 mm)
Fig. 3:
Connecting the compressed air supply

Advertisement

Table of Contents
loading

This manual is also suitable for:

Es05R415017129–bal–001–aa

Table of Contents