Standard Piping Installation Requirements; Boiler Head Loss - Burnham CHG CHG225 Installation & Operation Manual

Chg series condensing high efficiency gas - fired hot water boiler
Table of Contents

Advertisement

6.00
5.00
4.00
3.00
2.00
1.00
0.00
Figure .12: Boiler Head Loss
Observe the following guidelines when making the actual installation of the boiler piping:
1) The relief valve is packaged loose with the boiler and must be installed in the location shown in Figure 1. The relief
valve is set to open at 30 psi. If the valve is replaced, the replacement must have a relief capacity in excess of the
DOE heating capacity for the boiler. Pipe the discharge of the relief valve to a location where water or steam will
not create a hazard or cause property damage if the valve opens. The end of the discharge pipe must terminate in
an unthreaded pipe. If the relief valve discharge is not piped to a drain, it must terminate at least 6 inches above the
floor. Do not run relief valve discharge piping through an area that is prone to freezing. The termination of the relief
valve discharge piping must be in an area where it is not likely to become plugged by debris.
2) The fitting in which the gauge, relief valve and LWCO are to be mounted must not be moved from the factory
specified location (Figure 2.1).
PIPE rElIEf ValVE DIsChargE TO a safE lOCaTION.
DO NOT INsTall a ValVE IN ThE rElIEf ValVE DIsChargE lINE.
DO NOT INsTall rElIEf ValVE IN a lOCaTION OThEr ThaN ThaT sPECIfIED by
ThE faCTOry.
DO NOT Plug ThE rElIEf ValVE DIsChargE.
32
CHG150
0
5
C: Standard Piping Installation Requirements
CHG225
10
15
Flow (GPM)
DaNgEr
20
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Chg chg150Chg150Chg225

Table of Contents