Sharp VC-SA350 Service Manual page 25

Table of Contents

Advertisement

INSTALLING THE SHIFTER
Capstan
D.D. motor
Reel pulley
(Bottom side of mechanism chassis)
Figure 4-42.
Drum
Insert
point 3
Insert
point 2
Rotation
point 2
Shaft 1
Phase-matching
point 1
1. Make sure that the loading gear is at the PHASE-
MATCHING point 1 as shown below.
2. Install, paying attention to insert point 5 and release
point 3.
3. For the phase matching at the insert point 1, see the
PHASE-MATCHING point 2 as shown below.
4. Finally fix the inserts 1 and 4.
Phase-Matching
point 2
Loading gear (T)
Round mark
Sifter
Half round notch
Insert
point 4
Shaft 1
Shaft 2
Release
point 3
Figure 4-43.
25
VC-SA350/350W
VC-SA355
VC-SA550/550W
Insert
point 1
Shaft 1
Insert
point 5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vc-sa350wVc-sa355Vc-sa550Vc-sa550w

Table of Contents