Bunn TB3 Series Installation And Operating Manual

Bunn TB3 Series Installation And Operating Manual

Tb3 series

Advertisement

INSTALLATION & OPERATING MANUAL
To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts
Catalog, Programming Manual, or Service Manual, please visit the Bunn-O-Matic website, at
www.bunn.com. This is absolutely FREE, and the quickest way to obtain the latest catalog and
manual updates. For Technical Service, contact Bunn-O-Matic Corporation at 1-800-286-6070.
41465.0000 10/08 ©2008 Bunn-O-Matic Corporation
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
TB3 Series
Including: TB3; TB3-LP;
TB3Q; TB3Q-LP
STARTING WITH SERIAL NUMBER: TU00020000

Advertisement

Table of Contents
loading

Summary of Contents for Bunn TB3 Series

  • Page 1 To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts Catalog, Programming Manual, or Service Manual, please visit the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the quickest way to obtain the latest catalog and manual updates. For Technical Service, contact Bunn-O-Matic Corporation at 1-800-286-6070.
  • Page 2: Warranty

    SOLE OPTION AS SPECIFIED HEREIN, TO REPAIR, REPLACEMENT OR REFUND. In no event shall BUNN be liable for any other damage or loss, including, but not limited to, lost profits, lost sales, loss of use of equipment, claims of Buyer’s customers, cost of capital, cost of down time, cost of substitute equipment, facilities or services, or any other special, incidental or consequential damages.
  • Page 3: Table Of Contents

    • FAILURE TO COMPLY RISKS EQUIPMENT BEFORE BUYING OR USING THIS PRODUCT DAMAGE, FIRE OR SHOCK • BREWER ENERGIZED THIS APPLIANCE IS HEATED WHENEVER UNLESS UNPLUGGED CONNECTED TO A POWER SOURCE 00831.0000F 3/98 ©1998 BUNN-O-MATIC CORPORATION Page 3 #00656.0000 #00831.0000 WARNING 41465 082208...
  • Page 4: Electrical Requirements

    CAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up. 120V model brewers require 2-wire, grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz. "A" model brewers require 2-wire, grounded service rated 230 volts ac, 10 amp, single phase, 50 Hz. "B"...
  • Page 5: Plumbing Requirements

    " water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.
  • Page 6: Adjusting Brew Volumes

    NOTE: Check that the brewer is connected to water supply, the tank is properly filled, and a funnel and server are in place, prior to setting or modifying batch sizes. 1. Modifying batch sizes. To modify a batch volume, first check that the SET/LOCK switch is in the “SET” po- sition on the circuit board.
  • Page 7: Initial Set-Up (Tb3Q)

    CAUTION - The brewer must be disconnected from the power source throughout the Initial Set-Up, except when specified in the instructions. Remove the top lid from the brewer. Rotate the control thermostat knob fully counterclockwise to the "OFF" position and replace the top lid. Insert an empty funnel into the funnel rails.
  • Page 8: Initial Set-Up (Tb3)

    25. Reinstall the metal discharge tip into the funnel. 26. Load the funnel with a BUNN® paper filter and approximately four ounces of loose tea leaves. 27. Place the ON/OFF switch in the "ON" position, momentarily press the start switch, and allow both the con- centrate and dilution cycles to occur.
  • Page 9: Auto Sweetener Set-Up

    CAUTION - The brewer must be disconnected from the power source throughout the Initial Set-Up, except when specified in the instructions. Remove the top lid and both rear panels. Make sure the brewer water supply is off. Connect sweetener hose from the bag in a box delivery system to the rear fitting marked "Sweetener" . IMPORTANT - System delivery pressure must be regulated between 30-40 psi.
  • Page 10: Operating Controls

    Begin each brew cycle with a clean empty brew funnel and server. (Be sure the server lid doesn’t interfere with the flow of dilution water.) Insert a BUNN® filter into the funnel. Pour the packet of loose fresh tea leaves into the filter. Approximately three to five ounces is recommended for three gallons of beverage.
  • Page 11: Cleaning

    CAUTION - CLEAN AND SANITIZE YOUR ICED TEA BREWER DAILY 1. Remove and thoroughly clean the entire brew funnel. The funnel tip and screen must be free from any tea particles or residue. Reassemble the funnel. 2. Place the ON/OFF switch in the "OFF" position. Remove and thoroughly rinse the sprayhead. The holes must be open and clear of any mineral deposits.

This manual is also suitable for:

Tb3-lpTb3qTb3q-lp

Table of Contents