3 gallon iced tea brewer with portable server (2 pages)
Summary of Contents for Bunn TB3 Series
Page 1
To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts Catalog, Programming Manual, or Service Manual, please visit the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the quickest way to obtain the latest catalog and manual updates. For Technical Service, contact Bunn-O-Matic Corporation at 1-800-286-6070.
SOLE OPTION AS SPECIFIED HEREIN, TO REPAIR, REPLACEMENT OR REFUND. In no event shall BUNN be liable for any other damage or loss, including, but not limited to, lost profits, lost sales, loss of use of equipment, claims of Buyer’s customers, cost of capital, cost of down time, cost of substitute equipment, facilities or services, or any other special, incidental or consequential damages.
CAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up. 120V model brewers require 2-wire, grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz. "A" model brewers require 2-wire, grounded service rated 230 volts ac, 10 amp, single phase, 50 Hz. "B"...
" water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.
NOTE: Check that the brewer is connected to water supply, the tank is properly filled, and a funnel and server are in place, prior to setting or modifying batch sizes. 1. Modifying batch sizes. To modify a batch volume, first check that the SET/LOCK switch is in the “SET” po- sition on the circuit board.
CAUTION - The brewer must be disconnected from the power source throughout the Initial Set-Up, except when specified in the instructions. Remove the top lid from the brewer. Rotate the control thermostat knob fully counterclockwise to the "OFF" position and replace the top lid. Insert an empty funnel into the funnel rails.
25. Reinstall the metal discharge tip into the funnel. 26. Load the funnel with a BUNN® paper filter and approximately four ounces of loose tea leaves. 27. Place the ON/OFF switch in the "ON" position, momentarily press the start switch, and allow both the con- centrate and dilution cycles to occur.
CAUTION - The brewer must be disconnected from the power source throughout the Initial Set-Up, except when specified in the instructions. Remove the top lid and both rear panels. Make sure the brewer water supply is off. Connect sweetener hose from the bag in a box delivery system to the rear fitting marked "Sweetener" . IMPORTANT - System delivery pressure must be regulated between 30-40 psi.
Begin each brew cycle with a clean empty brew funnel and server. (Be sure the server lid doesn’t interfere with the flow of dilution water.) Insert a BUNN® filter into the funnel. Pour the packet of loose fresh tea leaves into the filter. Approximately three to five ounces is recommended for three gallons of beverage.
CAUTION - CLEAN AND SANITIZE YOUR ICED TEA BREWER DAILY 1. Remove and thoroughly clean the entire brew funnel. The funnel tip and screen must be free from any tea particles or residue. Reassemble the funnel. 2. Place the ON/OFF switch in the "OFF" position. Remove and thoroughly rinse the sprayhead. The holes must be open and clear of any mineral deposits.