Setup And Operation - Greenlee 35346 Instruction Manual

Capstan retrofit kit for super tugger
Table of Contents

Advertisement

Setup and Operation

While reading through this section of the manual, look
for components that are shaded in the illustrations. The
shading indicates components that are associated with
the accompanying text.
1. Fish the rope through the conduit.
2. Set up the cable puller mounting. Set it up so that
the rope will approach the capstan at an angle of
90° (±5°) as illustrated in Rope Approaching the
Capstan.
Note: If using an adapter sheave, flexible pipe
adapter, or mobile T-boom, see the illustrations
in this manual. If using a manhole sheave or floor
mount, see the instructions supplied with those
items.
Rope Approaching the Capstan
90° ±5°
Operator Tailing End
NO
When setting up the flexible pipe
adapter or puller, do not use the vise
chains on a structural support that
is less than 51 mm (2") or more than
254 mm (10") wide. An oversized
NO
or undersized structural support
can allow the puller to slide or break
loose and strike nearby personnel
with sufficient force to cause severe
injury or death.
Greenlee Tools, Inc.
6000-Series Super Tugger Cable Pullers
Install the vise chains properly.
• Follow the vise chain tightening instructions
• Do not allow the vise chains to bind at the corners
Failure to observe this warning can result in severe
injury or death.
3. Install the vise chains as shown.
POSITIONER
Ramp
4. Rotate the vise chain handles, by hand, clockwise
22
carefully. Improperly tightened chains can allow
the puller to slide or break loose and strike nearby
personnel.
when mounting the puller to a
rectangular support. The vise chain must be uni-
formly tight at all points.
Vise Chain Installation
A
E
B
POSITIONING
BLOCK
GRIPPING
FEET
a. Rotate the vise chain handle to expose most
of the threads. Leave only three or four threads
engaged in the handle.
b. Thread the chain though the hole in the frame.
Set the positioner against the positioning blocks.
c. Wrap the chain around the conduit, pipe sheave
adapter, or structural element.
d. Pull the vise chain tight and insert the chain pins
into the chain pockets, or recesses.
e. Turn the handle to slightly tighten the chain.
f. Repeat Steps A - E for the other chain.
to fully tighten the chain. Do not use tools, exten-
sions or "cheaters".
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070
square or
CHAIN
POCKETS
D
C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vb 6000Vb 6001Vb 6006Vt 6000Vt 6001Vt 6006

Table of Contents