This Section Identifies The Major Area Of The Machine; Operation Description; Labor Operation Number; Time - prime mover CMX60 Manual

Industrial truck flat rate
Table of Contents

Advertisement

Flat Rate Guide
Version no
000
4
Return
3. This section identifies the major
area of the machine.

3.1. Operation Description

The operation description identifies specific repairs and
combinations that are to be performed. The description is the
final result of the operation and any sub-operations which are
required to complete the major operation are included in the
operation description and time allowance.

3.2. Labor Operation Number

When an operation is performed, the "LON" number is to be
placed in the appropriate space on the warranty claim.

3.3. Time

The allowed time shown in this manual is the maximum time
required to completely perform the specific operation listed
using the proper tools, techniques and service information.
Times shown will be used for warranty compensation.

3.4. Review Of Labor Operation Times

If there is justification for a times guide change, complete the
review form at the end of this manual and send to:
BT Prime-Mover
Attention: Service Department
3305 North Highway 38
Muscatine, Iowa 52761-8800
LON Manual
1998-04-10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents